Loading...
HomeMy WebLinkAbout341775_1_Corrections.docxRESIDENTIAL PLAN CHECK COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101127502 PROJECT ADDRESS: 3216 S Manitoba Dr PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): R-3 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/18/2026 INITIAL REVIEW 6/9/2026 EXPIRATION 11/14/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Quoc Do 3. TEL: (714)458-5374 FAX: VALUATION: $135,103.00 EMAIL: doquocpl@yahoo.com FLOOD ZONE: X-06059C0259J Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☒Police Department approval on the corrected/final set of drawings (647-5840). ☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DrawingsSheet A-000 Add note on the coversheet: Minimum ____ kWdcPhotovoltaic system will be submitted under a separate permit and shall be issued prior to building frame inspection request. For Solar Exemption, applicant must provide calculated kWh required and 2025CEnC exemption on plans justifying exemption.THIS IS NOT A NOTESheet A-002 or A-003 Provide a complete plot plan showing – (R106.2)☒Identify the proposed imaginary property line. Provide dimension from each dwelling to proposed imaginary line. Specify all fire-rated requirements and elements on plan and provide/reference details. [R302]Sheet A-101Provide dimension to high vent from ridge on Proposed Roof Plan to ensure 1/300 required area used in calculation.Identify on Roof Plan and Floor Plan all projections and walls that require to be fire-rated with a hatch for clarity. It should not be left on the GC to determine if fire rated is required per detail. Sheet S1Detached ADU more than 500 square feet in liquefaction zone shall require 4’-0” overexcavation. Scarify option is not permitted. Else justify proposed work is not within a liquefaction zone. 90% Compaction report is still required at time of foundation inspection. Revise note in Special Foundation Notes as needed and ensure overexcavation with proposed ADU location relative to property line.See comment in calculations in regards to pad footing F2.CalculationsSheet 15-17 – Foundation for HFX shall be designed for lateral overturning or uplift. Justify only bottom bars within foundation. (End of Comment)