HomeMy WebLinkAbout341841_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101127516 &517 PROJECT ADDRESS: 2199 S Hathaway St PLAN CHECK ENGINEER: Ahangian, KathyTEL:714 647-5812 EMAIL: Kahangian@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: V B OCCUPANCY CLASSIFICATION(S): B PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 5/19/2026 INITIAL REVIEW 5/31/2026 EXPIRATION 11/15/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Bryan Manaog 3. TEL: (424)337-9139 FAX: VALUATION: $50,000.00 EMAIL: bryan@gibbs1934.com FLOOD ZONE: X-06059C0278J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit 2corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5812 for an appointment.Please return marked up set of drawings with corrections.Clearly indicate the scope of work under this building permit application:( Add new roof screen scope of work) - Revise project job description on the building permit application worksheet to reflect the work to be done under the subject building permit application. - Construction drawings must clearly show all work to be done under the subject building permit application. - Delete all notes and details from drawings that are not a part of the work to be done under the subject building permit application. This includes mechanical, plumbing and electrical work that is not specifically required by the Building Code.This review does not include mechanical, plumbing, fire sprinkler system, or electrical work. Separate plans, applications, fees, plan checks, and permits are required for mechanical, plumbing, fire sprinkler systems, and electrical work. Call 647-5800 for information.The applicant shall obtain clearances/approvals for the following prior to building permit issuance: - Planning Division approval on the corrected/final set of drawings (647-5804.) Previously approved plans should be submitted to expedite the process. - Fire Department approval on the corrected/final sets of drawings ((714)573-6100) - Police Department approval on the corrected/final set of drawings (647-5840) - Public Works Agency approval (647-5039) - Proof of Worker’s Compensation Insurance shall be required at the time of permit issuanceSubmit a signed copy of the contract showing labor and materials for all work to be done under the subject building permit application. The plan check engineer may accept the contract price as the valuation of improvements for unique/unusual projects in lieu of using a cost per square foot basis.Drawings must be to scale and be on 18” x 24” minimum sheets. - Provide a fully dimensioned Floor Plan Provide the following: - Provide a fully dimensioned site plan on each set of plans. - Disabled access compliance must be shown on the site plan. - Show all property lines of record on the site plan. Show path of travel to new suite 2199.Sheet A1.00, identify public sidewalk and private sidewalk.Sheet A1.00, item #5, please clarify 4 high landscaping.Provide address for each suite on the site plan.Show existing main address. Indicate detail and section references as to their appropriate location on plan view.Is there a new opening for suite 2199? ( sheet A2.01) if there is provide complete construction detail.Sheet A2.00, is there a roll up door between unit 1331 and adjacent unit.Provide typical section view detail of all new partitions and ceilings showing: - Size, spacing, and material of framing members - Note gauge and ICC Research Report number and installation/construction requirements for metal framing members. - Method of attaching framing to the building structure. Compliance shall be shown with CBC Section 1607.13 for lateral support of the walls. Do not support top of walls to suspended ceiling system unless calculations and drawing prepared by a registered engineer are submitted for review. Submit structural engineering calculations for walls in rooms with a floor to building structure above height greater than 14’. - Provide on the drawings details for the lateral support of partitions, rails and similar space dividers less than 5’ 9” in height. - Heights of partition, suspended ceiling, structure above.Provide ceiling plan and show if here is any alteration to the ceiling.CBC Section 1022.2.2, Exterior exit doors shall lead directly to the exit discharge or the public way.CBC Sections 1028, EXIT DISCHARGE. That portion of a means of egress system between the termination of an exit and a public way.Provide on the drawings a complete door schedule, showing:( For new and existing doors) - Door sizes - Hardware complying with exiting and disabled accessibility requirements Sheet A3.01, provide permit number for gates or remove he gates on the south elevation. Note on drawing: “Exit doors shall be openable from the inside without the use of a key or any special knowledge or effort.”CBC Section 1013.1, Exit doors shall be marked so that they are readily distinguishable from the adjacent construction.All doors require a level floor landing on each side in accordance with CBC Sections 1008.1.4, 1008.1.5, 1008.1.6, and 1133B.2.4 and CBC Figures 11B-26A and 11B-26B. Provide typical door threshold details and details of change in floor covering material.CBC Sections 11B-303, Regardless of the occupant load, there shall be a floor or landing on each side of a door. The floor or landing shall be not more than ½” lower than the threshold of the doorway. Change in level between ¼” and ½” shall be beveled with a slopegreater than 1:2. Change in level greater than ½” shall be accomplished by means of a ramp. Provide detailed sections and plan views showing compliance at all doorways requiring accessibility.Provide minimum 48” clearance between door in office and door to the retail showroom.CBC Section 11B-404.2.7, Hand-activated door opening hardware shall be centered between 30” and 44” above the floor. Latching and locking doors that are hand activated and which are in a path of travel shall be operable with a single effort by lever-type hardware, by panic bars, push-pull activating bars, or other hardware designed to provide passage without requiring the ability to grasp the opening hardware. Locked exit doors shall operate as above in egress direction.CBC Section 11B404.2.9, Note on the drawings: “Maximum effort to operate doors shall not exceed 5 pounds for exterior doors and interior doors, such pull or push effort being applied at right angles to hinged doors and at the center place of sliding or folding doors. Compensating devices or automatic door operators may be utilized to meet the above standards. When fire doors are required, the maximum effort to operate the door may be increased to the minimum allowable by the appropriate administrative authority, not to exceed 15 pounds.Provide minimum 12” clearance to eh strike edge of storage door.Exit illumination and exit sign requirements in accordance with CBC Section 1013 shall be shown on the drawings. Be specific as to the type of exit signs to be installed.Tactile exit signs shall be required at the following locations: - Each grade-level exterior exit door shall be identified by a tactile exit with the word “EXIT.” - Each exit access door from an interior room or area to a corridor or hallway, which is required to have a visual exit sign, shall be identified by a tactile exit sign with the words “EXIT ROUTE.” - Each exit door through a horizontal exit shall be identified by a sign with the words “TO EXIT.”Drawings submitted to the building Division for review shall provide the following information to insure compliance with CBC section 11B-202.4.An Accessible entranceAn accessible route to the altered areaAccessible restroomsParking, signage and alarmIf a walk crosses or adjoins a vehicular way, and the walking surfaces are not separated by curbs, railings or other elements between the pedestrian areas and vehicular areas, the boundary between the areas shall be defined by a continuous detectable warning which is 36” wide, complying with the CBC Section 11B-247.1.2.5CBC Section 11B-406.5.3 Curb ramps shall comply with CBC Section 11B-406. A level landing 4’ deep shall be provided at the upper end of each curb ramp over its full width to permit safe egress from the ramp surface, or the slope of the fanned or flared sides of the curb ramp shall not exceed 1 unit vertical to 12 units horizontal (8.33% slope).CBC Section 11B-208.2.4. One in every six accessible spaces, but not less than one, shall be served by an access aisle 8’-0” (96”) wide minimum and shall be designated van accessible as required by Section 11B-502. The words NO PARKING shall be painted on the ground within each eight’ loading and unloading access aisle. This notice shall be painted in white letters no less than 12” high and located so that it is visible to traffic enforcement officials. Provide completely dimensioned floor plans, elevations and sections of sanitary facility insuring wheelchair clearances complying with CBC Section 11B603 ,11B604 and the California Plumbing Code.Provide complete grab bar details on the drawings showing compliance with CBC Section 11B-604.5 including structural strength to support a 250 pound point load.Provide bathroom for new suite.CBC Section 11B-220.2, Show check stand complies with accessibility requirements.Complete the attached Disabled Accessibility Documentation Form.Provide structural calculations and drawings, stamped and signed by a California licensed architect or registered civil engineer for: - New opening(s) in bearing wall(s) - New equipment screening on roof and New roof top units.Identify all members on sheet A2.03.Sheet A2.03, show location and size of the removed HVAC and show how it is being filled.Identify use of the details on sheet A8.02 and sheet A8.01.Unable to find permit number for Fire sprinkler, please provide permit number.