Loading...
HomeMy WebLinkAbout342355_1_Corrections.docxTENANT IMPROVEMENT PLAN CHECK COMMENTS COMMENTS Planning & Building Agency Building Safety Division 20 Civic Center Plaza P.O. Box 1988 (M-19) Santa Ana, CA 92702 (714) 647-5800 www.santa-ana.org PLAN CHECK NO: 101127688 PROJECT ADDRESS: 511 N Grand Ave PLAN CHECK ENGINEER: Lo, JonathanTEL:714 647-5822 EMAIL: Jlo@santa-ana.orgFAX:714 647-5897 TYPE OF CONSTRUCTION: III B, SPK OCCUPANCY CLASSIFICATION(S): S-1 PLAN CHECK DATES: REMARKS/RECHECK ITEMS: APPLICATION 6/4/2026 INITIAL REVIEW 6/7/2026 EXPIRATION 12/1/2026 RECHECKS: 1. PROJECT APPLICANT CONTACT PERSON: 2. Joseph Reynoso 3. TEL: (323)594-6730 FAX: VALUATION: $250,000.00 EMAIL: josephr@oltmans.com FLOOD ZONE: X-06059C0276J APPLICABLE CODE: 2022 CALIFORNIA BUILDING CODE (CBC) WITH CITY OF SANTA ANA AMENDMENTS All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.Please return marked up set of drawings with corrections. The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY): ☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process. ☒Public Works Agency approval (647-5039). ☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700). ☐Police Department approval on the corrected/final set of drawings (647-5840). ☐School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work. ☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance. ☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.Documentation Provide a complete site plan showing – Location and size of all structures on the lot. Identify all property lines and easements, streets, etc. Show north arrow.DrawingsSheet AN.11Arch shall provide a project specific updated floor plan with storage racks identified, clear exiting plan, and dimensions around racks to meet all accessible requirements. Previous permitted drawings should not be used where racking system is noted to be deferred.Sheet SH-01Permit specific data shall be provided on the first sheet (e.g. Sheet Index, building info, project scope, code reference, etc…)Shelves and dimensions on plan are illegible. Shelve layout shall be identified clearly, not just within hatch of area of work. This applies to both architectural and structural plans.Note on the drawings locations and inscriptions of 50 square inch minimum size permanent plaques installed in conspicuous locations, showing the maximum permissible unit load in clear, legible print.CalculationsSheet 5/39 – Provide “d” value used in calculations for all rack types. (End of Comment)