PLAN CHECK NO:
101127400
PROJECT ADDRESS:
1513 W Warner Ave Unit# 2
PLAN CHECK ENGINEER:
Lo, JonathanTEL:714
647-5822
EMAIL:
Jlo@santa-ana.orgFAX:714
647-5897
TYPE OF CONSTRUCTION:
V B
OCCUPANCY CLASSIFICATION(S):
R-3
PLAN CHECK DATES:
REMARKS/RECHECK ITEMS:
APPLICATION
5/5/2026
INITIAL REVIEW
5/26/2026
EXPIRATION
11/1/2026
RECHECKS:
1.
PROJECT APPLICANT CONTACT PERSON:
2.
Raz Grinbaum
3.
TEL:
(818)448-1355
FAX:
VALUATION: $65,000.00
EMAIL:
rgpermits1@gmail.com
FLOOD ZONE: X-06059C0259J
Note: Numbers in parenthesis (unless otherwise noted) refer to code sections of the 2022 California Residential Code (CRC); 2022 California Building Code (CBC); CMC = 2022 California Mechanical Code; CPC = 2022 California Plumbing Code; CEC = 2022 California Electrical Code; T = Table; ICC = International Code Council.All items noted on this plan check report must be addressed. If you feel that an item is not applicable to your project, note “N/A” and discuss the reason with the plan checker.Please indicate the sheet number and detail to the right of each correction, or note the number on the plans where the correction is made. Resubmit marked original, calculations and this correction sheet. A separate sheet for response may be used.Resubmit corrected sets of plans.Meetings between the project applicant/designer and the plan reviewer shall be by appointment only. Please call (714) 647-5822 for an appointment.
The applicant shall obtain clearances/approvals for the following after obtaining approval from Building and Safety Division, prior to building permit issuance (CHECKED BOXES REQUIRED ONLY):
☒Planning Division approval on the corrected/final set of drawings (647-5804). Previously approved plans should be submitted to expedite the process.
☒Public Works Agency approval (647-5039).
☐Fire Department approval on the corrected/final set of drawings (647-5839 or 647-5700).
☒Police Department approval on the corrected/final set of drawings (647-5840).
☒School District Approval; and a copy of the school fee worksheet, completed by the plan check engineer, shall be required by the School District to verify the scope of the work.
☐Proof of Worker's Compensation Insurance shall be required at the time of permit issuance.
☐Grading Permit. Application is made through the Building Safety Division (647-5800) and the plan review is by the Public Works Agency (647-5039).Comments have been provided on drawing and calculation hard copies in relation to all comments below. Applicant must pick up red marked sets from city prior to resubmittal and return marked up set with resubmittal.DocumentationEnsure all handwritten items on original set are on printed on resubmitted drawing set.2025 CALIFORNIA GREEN BUILDING STANDARDS CODE shall be completed by applicant and provided in drawing set.DrawingsSheet T-1
All persons preparing plans, specifications, and instruments of service for others shall sign those plans, specifications and other instruments of service for others shall sign those plans, specifications and other instruments of service and all contracts therefore.
Provide the following design data on the first sheet (R106.1.1)
☐Sheet Index
☐Occupancy groups (R-3/U)
☐Type of construction (V-B)
☒Automatic Fire Sprinkler (YES or NO)
☐Number of stories.
☒Flood Zone: X
☐Flood Zone: A
☐Flood Zone: AE
☐Floor area per occupancy group, including the existing structure(s)
☐Construction shall comply with the 2025 CRC, CBC, CPC, CMC, CEC, California Green Building Code, and California Energy Efficiency Standards Code editions.
Please provide new ADU square footage to existing single family residence square footage ratio (ADU sf / SFD sf) on the Cover Sheet. Square footages shall NOT include garage, non-habitable attic space, non-habitable basement space, patio cover, patio enclosure, sunroom and similar uses.Note the following on cover sheet:ADU / SFD = ____sf / ____ sf = ____% The ADU sf / SFD sf ratio is for Park & Rec fee purpose only. The applicant is responsible for the given “SFR sf” of the existing primary residence; Building Safety staff are not responsible for the accuracy of the given “SFR sf”.
Note on plan: Mechanical, electrical and plumbing are not part of this plan review and approval. The Building and Safety Division plan review does not include potential electrical, water, or gas revisions required by any non-city utility company. It is solely on the contractor to ensure proposed addition or alteration can and will meet utility company requirements. MEP are subject to building field inspection.Sheet A-1Area of where existing wall and new wall abut is not clear. Provide detail/section for double wall and provide fire rated detail for double wall condition.Detail 2 – Verify ceiling drywall with Sections on sheet A-4. Ceiling does not match. If ceiling is not rated, rated wall shall span to underside of roof sheathing.Detail 3 – Specify a Gyp-association file number for proposed interior wall system. Proposed system shall be shown to meet construction requirements fully. Detail 3 – Clarify Note 3.
Penetrations in wall or floor/ceiling assemblies in two-family dwellings shall comply with Section R302.4. Provide complete details on the plans. Sheet A-2Provide Smoke Alarm in bedroom and directly outside vicinity of bedroom.Provide Carbon Monoxide Alarm directly outside vicinity of bedroom.
The following Electric Ready notes shall be added and constructed for new detached residential structures:
Water Heating system (water heater) – (Section 150.0(n))
Systems using gas or propane water heaters to serve individual dwelling units shall designate a space at least 2.5 feet by 2.5 feet wide and 7 feet tall suitable for the future installation of a heat pump water heater (HPWH) by meeting either A or B listed under Section 150.0(n). Specify designated space on plans.
If the designated space is within 3 feet from the water heater:
A dedicated 125 volt, 20 amp electrical receptacle that is connected to the electric panel with a 120/240 volt 3 conductor, 10 AWG copper branch circuit, within 3 feet from the water heater.
ii. Isolate both ends of the unused conductor.
A reserved single pole circuit breaker space in the electrical panel adjacent to the circuit breaker
A condensate drain that allows natural draining of the water heater.
. If the designated space is more than 3 feet from the water heater: see additional Code requirements.
When a second water heater is installed as part of the addition shall comply with Section (150.2(a)(D). Sheet A-3
Roofing requirements – (R902.1)
☒Cool roof is required. On the plan, specify CRRC #. Sheet A-4Specify on Roof Plan and reference fire rated projection where required.Sheet S-2Detail 4 – Provide clearance for reinforcing in all directions, rebar spacing is not clear and visually close. Sheet S-3Provide detail for top of interior shearwall. Detail shall show existing rafter interaction and full shear transfer.New ceiling joists size does not match calculations. Revise drawings to match.Detail 2 – Provide hurricane ties at roof rafters, else justify uplift support. Sheet ENV-1Verify ADU Conditioned Floor Area specified in T-24 Compliance. CalculationsCJ – Justify design utilizing fully braced beam. Ceiling joist are not fully braced with drywall.Justify repetitive factor used. A load-distributing system is required to utilize a repetitive factor. Drywall system is not a load-distributing system.(End of Comment)