My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23B - STREET MAINTENANCE CONTRACT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/05/2018
>
23B - STREET MAINTENANCE CONTRACT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 7:56:42 PM
Creation date
5/31/2018 7:47:41 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
23B
Date
6/5/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
POCKET REVERSE TAPER <br />CURVE <br />R=100 <br />14 <br />1 10' <br />13' 23' <br />DETAIL ''FI' <br />®iiia <br />IwSp{R IFIUR'pd <br />mxmw w mem <br />I. <br />FS SM ILII It IPI'SIEL. IGOEI <br />O 11 NF Fw OMEXwR�M <br />OIrt Rn LIPWINIXw I IEET CL WNICE fqw KGIRAI T SI.. <br />DETAIL "GT <br />i" i <br />(NTS) <br />SANTA ANA <br />PUBLIC MAM1S AGENCY <br />INSTALL 1 <br />WHITE LIN <br />AT B' O.0 <br />— 55' — <br />REVERSE <br />CURVE <br />R=100 <br />ADDENDUM No. One <br />NOTES: <br />® SANTA ANA STOE PLANG11256-1 BETA IIY"9". <br />(D INSTALL LEGEND <br />WHITE THERMOPLASTIC IF NOT SPECIFIED) <br />0 INSTALL TINTO TURN LANE LINE PER CITY OF <br />, 8' SANTA ANA SID. PLAN IJ253-1 DETAIL V. <br />0 INSTALL 12" CROSSWALK <br />MATE THERMOPLASTIC IF NOT SPECIFIED) <br />'1 0 INSTALL STOP BAR ANO/OR STOP LEGEND. AS <br />27 <br />13' <br />DETAIL 'Ir <br />KI.A'. <br />DETAIL THY' <br />-100'- <br />POCKET <br />17' <br />10' <br />13' <br />00' <br />PROJECT 18-6907 <br />LOCAL STREET PREVENTATIVE MAINTENANCE <br />FY 2017-18 <br />23B-37 <br />EXHIBIT 6 <br />25' <br />
The URL can be used to link to this page
Your browser does not support the video tag.