My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25C - AGMT FIFTH ST PARKING LEASE
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/05/2018
>
25C - AGMT FIFTH ST PARKING LEASE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 7:57:19 PM
Creation date
5/31/2018 7:47:54 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25C
Date
6/5/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
III. Th_- following are requirements that shall be addressed and/or aooroved by the <br />Public Works Agency prior to issuance of a building permit: <br />1. A Master -Meter of appropriate size, shall be placed in the sidewalk area, <br />adjacent to the curb line, along the property's frontage in the public right-of- <br />way, <br />2. Private water meters shall be installed within the property (upon connection to <br />the proposed public Master -Meter) in order to allow individual residential units <br />to be served separately for their domestic water needs. <br />3. Prior to submittal into Building plan check, depict and note the approximate <br />location for all existing and new wet and dry utilities, mains and laterals (i.e. <br />electric, gas, water, fire, sewer, storm drain, etc.). <br />4. Prior to submittal into Building plan check, depict and note that all utilities <br />(existing and new) will be a minimum of 10 feet away from the driveways top <br />of the "X". <br />5. Prior to submittal into Building plan check, depict and note replacement of <br />damaged sidewalk and driveway on Bush Street on all construction plans. <br />6. Prior to submittal into Building plan check, depict construction of a minimum <br />8 -inch private sewer lateral within this site, to connect the proposed project to <br />the existing City sewer system in 4th Street. <br />7. Prior to submittal into Building plan check, begin review process of surface <br />street improvement and utility plans by making the initial submittal of the listed <br />plans and maps, and paying the required fees. <br />8. The site plan shall be designed to allow for the safe and efficient access of <br />trash vehicles to trash receptacles to the satisfaction of.the Public Works <br />Agency and waste service provider. <br />Resolution No. 2018-04 <br />Page 8 of 8 <br />25C-29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.