My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AGMT EVC STATION
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/05/2018
>
25G - AGMT EVC STATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 7:58:10 PM
Creation date
5/31/2018 7:48:11 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Finance & Management Services
Item #
25G
Date
6/5/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DocuSign Envelope ID: 15B65A35-DCA7-4094-905A-907FA5OAO6E9 <br />11.2 WAIVER. The failure of either Party at anytime to enforce any provision of this Agreement <br />shall not be construed to be a waiver of the right of such Parry to thereafter enforce that provision or any other <br />provision or right. <br />11.3 FORCEMAJEURE. Except with respect to payment obligations, neither CPI nor Subscriber <br />will be liable for failure to perform any of its obligations hereunder due to causes beyond such party's <br />reasonable control and occurring without its fault or negligence, including but not limited to fire, flood, <br />earthquake or other natural disaster (irrespective of such Party's condition of any preparedness <br />therefore); war, embargo; riot; strike; labor action; any lawful order, decree, or other directive of any <br />government authority that prohibits a Party from performing its obligations under this Agreement; <br />material shortages; shortage of transport; and failures of suppliers to deliver material or components in <br />accordance with the terms of their contracts, <br />11.4 ARBITRATION. This Agreement is to be construed according to the laws of the State of <br />California, excluding the provisions of the United Nations Convention on Contracts for the International <br />Sale of Goads and any conflict of law provisions that would require application of another choice of law. <br />Except with respect to any matter relating to Subscriber's violation of the intellectual property rights of <br />CPI, any dispute arising from or relating to this Agreement shall be arbitrated in Orange County, California. <br />The arbitration shall be administered by JAMS in accordance with Its Comprehensive Arbitration Rules <br />and Procedures, and judgment on any award may be entered In any court of competent jurisdiction. If <br />the Parties agree, a mediator may be consulted prior to arbitration. All claims shall be brought in the <br />parties' individual capacity, and not as a plaintiff or class member in any purported class or representative <br />proceeding. With respect to any matter relating to the intellectual property rights of CPI, such claim may <br />be litigated in a court of competent jurisdiction. The prevailing party in any dispute arising out of this <br />Agreement shall be entitled to reasonable attorneys' fees and costs. <br />11.5 NOTICE TO CALIFORNIA CUSTOMERS. <br />(a) California's Low Carbon Fuel Standard ("LCFS") was enacted to ensure that the <br />mix of fuels sold by California oil refiners and distributers meets applicable greenhouse gas emissions <br />targets. California has a statewide goal to reduce carbon Intensity of transportation fuels by at least 10% <br />by 2020. <br />(b) The ChargePoint Network can track the fueling of electric vehicles, which <br />positively contributes to reducing California's carbon intensity. If applicable reporting requirements are <br />met, LCFS credits are Issued by the California Air Resources Board. An available LCFS credit maybe claimed <br />by certain owners and operators of electric vehicle charging stations, including both Subscriber and CPI. <br />However, the LCFS credits are only available to one party, meaning any available credits may be claimed <br />by either Subscriber or CPI, but not by both. CPI intends to claim available LCFS credits generated from <br />use of the Charging Stations, but will not claim any available LCFS credits that Subscriber Intends to claim. <br />If Subscriber intends to claim the LCFS credits, it must engage in the reporting and other administrative <br />obligations necessary to generate such credits. <br />(c) Subscriber agrees that it will provide CPI with written notice of Its intent to claim <br />LCFS credits within ten (10) days of the date of the Effective Date. If Subscriber does not currently intend <br />to claim the LCFS credits, but desires to do so at any time in the future, Subscriber may, by providing <br />written notice to CPI, elect to claim LCFS credits generated thirty (30) days or more after the date of such <br />notice. Subscriber represents and warrants to CPI that, in the absence of providing written notice, <br />Subscriber will not claim any LCFS credits. All notices shall be provided by email to CPI at <br />Icfsnotification g chareepoint.com. <br />Page 11 of 20 <br />25G-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.