My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO THE MADISON APPEAL
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/05/2018
>
55B - RESO THE MADISON APPEAL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2018 8:01:15 PM
Creation date
5/31/2018 7:49:07 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
55B
Date
6/5/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Site Plan Review No. 2016-03, Variance No. 2017-05, and Variance No. 2017-06 are <br />approved subject to compliance, to the reasonable satisfaction of the Planning Manager, <br />with applicable sections of the Santa Ana Municipal Code, the California Administrative <br />Code, the California Building Standards Code, and all other applicable regulations. In <br />addition, it shall meet the following conditions of approval: <br />The Applicant must comply with each and every condition listed belownp for to exercising <br />the rights conferred by this site plan review and variances. <br />The Applicant must remain in compliance with all conditions listed below throughout the <br />life of the development project. Failure to comply with each and every condition may result <br />in the revocation of the site plan review and variances. <br />A. Planning Division <br />1. All proposed site improvements must conform to the Site Plan Review approval <br />of DP No. 2016-38. <br />2. Any amendment to this site plan review, including modifications to approved <br />materials, finishes, architecture, site plan, landscaping, unit count, mix, and <br />square footages must be submitted to the Planning Division for review. At that <br />time, staff will determine if administrative relief is available or if the site plan <br />review must be amended. <br />3. The project shall comply with all mitigation measures as required by the Metro <br />East Mixed -Use Overlay Zone. <br />4. A residential property manager shall be on-site at all times that the project is <br />occupied. <br />All new utilities and mechanical equipment such as backflow devices, Edison <br />transformers, and double check detector assembly devices shall not be located <br />within front yard setbacks and must be screened from view from public and <br />courtyard areas. <br />6. All parking for the project, including visitor parking spaces, shall be made <br />available free of charge. <br />7. The interior of the parking structure shall be painted white. <br />Resolution No. 2018-xx <br />Page 7 of 10 <br />55B-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.