My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (2) - 2016
Clerk
>
Contracts / Agreements
>
O
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
>
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA) (2) - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2018 10:54:23 AM
Creation date
6/12/2018 10:01:40 AM
Metadata
Fields
Template:
Contracts
Company Name
ORANGE COUNTY TRANSPORTATION AUTHORITY (OCTA)
Contract #
A-2016-055
Agency
PUBLIC WORKS
Council Approval Date
4/5/2016
Expiration Date
4/5/2020
Destruction Year
2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COOPERATIVE AGREEMENT NO. C-5-3589 <br />WESTMINSTER AVENUE 117TH STREET - RTSSP <br />1 ARTICLE 4. RESPONSIBILITIES OF THE AUTHORITY AS PROJECT LEAD AGENCY <br />2 The AUTHORITY as the LEAD AGENCY agrees to the following responsibilities for the <br />3 implementation of the PROJECT: <br />4 A. AUTHORITY shall act as the LEAD AGENCY for the work necessary to manage, procure, <br />5 and complete the PROJECT as identified in APPLICATION. <br />6 B. To coordinate outreach with PARTICIPATING AGENCIES for PROJECT. <br />7 C. To collect all data necessary to provide new optimized timing plans including, but not <br />8 limited to, manual intersection all movement counts, and twenty four (24) hour / seven (7) day automated <br />9 machine traffic counts with vehicle classification. <br />10 D. To develop and implement new timing plans optimized for signal synchronization. <br />11 E. To provide updated timing plans for all control systems and all relevant data used to <br />12 develop said plans to PARTICIPATING AGENCIES. <br />13 F. To prepare a "Before and After Study" for PROJECT as described in the Measure M2 <br />14 Eligibility Guidelines adopted by the AUTHORITY. The 'Before and After Study" for the project is <br />15 considered the equivalent of the required Project Final Report (Measure M2 Ordinance No. 3, Section <br />16 13,111.9) for PROJECT, The AUTHORITY shall provide the "Before and After Study" to the <br />17 PARTICIPATING AGENCIES in draft and final formats for review and comment. AGENCY comments <br />18 shall be noted in the final study. If specified in APPLICATION, AUTHORITY shall provide a "Before and <br />19 After Study" video of a representative portion of PROJECT at up to two public meetings. <br />20 ARTICLE 5. RESPONSIBILITIES OF THE PARTICIPATING AGENCIES <br />21 PARTICIPATING AGENCIES agree to the following responsibilities for implementation and <br />22 funding of PROJECT: <br />23 A. Provide a technical representative to meet and participate as a member of the <br />24 PROJECT's Traffic Forum. <br />25 B. To authorize the AUTHORITY to manage, procure, and implement all aspects of <br />26 PROJECT. <br />Page 6 of 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.