Laserfiche WebLink
COOPERATIVE AGREEMENT BETWEEN THE CITY OF SANTA <br />ANA AND THE CITY OF COSTA MESA FOR THEEr <br />CONSTRUCTION OF THE SANTA ANA DELHI DIVERSION <br />�; <br />FORCED SEWER MAIN UNDER BRISTOL STREET FROM – <br />BAKER TO NEWPORT BEACH BOULVARD <br />y- -e C tlk- <br />This cooperative agreement ("Agreement") is made and entered into this day of <br />rA N%i . 2016, by and between the CITY OF COSTA MESA, a municipal <br />corporati— o OSTA MESA"), and the CITY OF SANTA ANA, a municipal corporation <br />("SANTA ANA"). <br />RECITALS: <br />A. WHEREAS, the City of Santa Ana, Orange County Flood Control District, the County of <br />Orange, the City of Newport Beach, the City of Costa Mesa, and the Irvine Ranch Water <br />District are all parties to a separate agreement for the construction, maintenance, and <br />operation of the Santa Ana Delhi -Diversion Channel Project ("Diversion Channel <br />Project'); which is a collaborative effort to address regional water quality issues, and <br />B. WHEREAS, one aspect of the Diversion Channel Project's proposed plan is to install, <br />operate, and maintain forced sewer main pipelines within public street right-of-way of <br />COSTA MESA, and <br />C. WHEREAS, COSTA MESA agreed to contribute to the Diversion Channel Project a lump <br />sum amount of $600,000, and <br />D. WHEREAS, in a separate and different project to begin before construction of the <br />Diversion Channel Project, COSTA MESA will hire its own contractor to perform certain <br />work in the median on Bristol Street within the city of COSTA MESA ("Bristol Street <br />Median Project'), and <br />E. WHEREAS, to benefit the Diversion Channel Project in terms of time and cost savings, <br />COSTA MESA is agreeable to having its contractor for the Bristol Street Median Project, <br />perform that portion of the Diversion Channel Project which calls for forced sewer main <br />pipelines to be installed within Bristol Street between Baker Street to Newport Boulevard; <br />as shown in Exhibit A, and <br />F. WHEREAS, COSTA MESA desires, therefore, that COSTA MESA'S lump sum financial <br />obligation to the Diversion Channel Project be offset by the cost of work performed by its <br />contractor on the Bristol Street Median Project related to installing the forced sewer main <br />pipeline, and <br />G. WHEREAS, SANTA ANA is agreeable to advancing to COSTA MESA the funds required <br />to cover the costs incurred by COSTA MESA to pay its contractor on the Bristol Street <br />Median Project to install the forced sewer main pipeline ("Advanced Expended Funds"); <br />Page 1 of 12 <br />