Dune Luzuelaga, P.E., QSD/p
<br />EROSION CONTROL AND SWPPP . TASK MIANA6ER
<br />Dave has been involved In a multitude atprojects over his 86 -year oareer, His
<br />background includes a wide range of civil engineering projects for higher education
<br />fooilitles and land,developmentproject, in Southern California. His overall grasp of
<br />.general civil engineering, the process Involved, and the ever-complicaterd permit approvals bas
<br />consistently appealed to clients,
<br />Professional Credentials
<br />Bachelor of Science, Civil Engineering, California Polytechnic State Unlyaraity, San, Luis Obispo
<br />Profossloihal Engineer In California (#68784)
<br />Qualifled SWPOP DevolopotlPract@toner (900687)
<br />California Board for:CIVII Enginoom:snd Land Surveyors, Board Member
<br />Relevant t peelertoe
<br />Ad Sallflower Unified School District, Mayfair High
<br />School STEAM Building, Track and Field Stadium,
<br />and Additional Improvements, Lakewood, CA—
<br />Project Manager
<br />• Lake Elsinore Unified School District, Elsinore High
<br />Schoot,'Synthetio Baseball Field and Courtyard
<br />Redeslgn, Wfldomar, CA -- Project Manager
<br />i Long Beach City College, Master Pian. Update for
<br />New Sports Complex and'Ktnostology and Health
<br />Education Building, Long Beach, CA ---Project
<br />Manager
<br />A Change Unified Sohooi Distrlol Orange High
<br />School Improvements, Orange, CA .. Project
<br />Manager
<br />A Rio Hondo College, Nursing Village, Transit
<br />Coater, and Library Tower, Whittier, CA — Project
<br />Manager
<br />/ Vlawpdint School, AJE Services for Sports Facility
<br />and Two Parking Lots, Calabasas, CA -- Project
<br />Manager
<br />• Long Beach City College, Due Diligence, New
<br />Sports Complex, and now Kinesiology Building,
<br />Long Beach, CA -« Project Manager
<br />• Rio Hondo College, Nursing Vlilagga, Transit
<br />Center, and Library Tower $eismic:Retrofit,
<br />Lakewood, CA — Project Manager
<br />d Cypress College, Baseball Field, Cypress, CA
<br />Project Manager
<br />/ Orange Coast College, Substation, Costa Mesa,
<br />CA — Project Manager
<br />KimLny»)Horn
<br />i Fullerton College, Softball Field, Softball Betting
<br />Cage ADA Upgrades, Fullerton, OA ---Project
<br />Manager
<br />A College df the Cbnyons, Soccer Field and
<br />Accessibility Upgrades, Santa Ciarlta, CA -
<br />Project Manager
<br />A EI Camino College, 'Campus Wide Utility Mapping,
<br />and Water Main Relocation Plan, Torrence, CA --
<br />Project Manager
<br />A Viewpoint School, Preliminary design of Three
<br />Parking Lots, Six Tennis Courts, Sower Alignment,
<br />and Multl-Uta Synthetic Sports Field, Calabasas,
<br />CA--- Projeot Manager
<br />A Mater Del High school, Parking Lot Re -Striping,
<br />ADA Upgrades, New Modular Building, and
<br />Portables, Santa Ane, CA Project Manager
<br />Mayfair High School, interim Classroom Modular
<br />Village, Now STEAM Building, New Tracicand
<br />Field Stadium, New Synthatio Sports Field, LA
<br />County Culvert Design and Conversion of Open
<br />Channel, and Storm Drain Percolation Field,
<br />Lakewood, CA --Project Manager
<br />i Elsinore High School, Now Synthetic Baseball
<br />Field, Courtyard Redesign, Wildomar, CA --
<br />Project Manager
<br />Orange High School, Now STEM Building, Design
<br />of the Interim Portable Village, Campus Wide Utility
<br />Upgrades, and Relocation of a Bus Drop Off,
<br />Orange, CA— Project Manager
<br />25E-132
<br />.t<
<br />
|