Kar rola Fidler, AMP, CPESC
<br />ENVIRONMENTAL AND $WPPP — TASK MANA45ER
<br />Kerins has nearly 20 years of all , erionce as an environmontal planner providing field
<br />Investigations and 0WA and N PA documentation forpubNc and private sector
<br />projeots. She has completed numerous Phase 1 Environmental Site Assessments,
<br />Phase 11 ESAs, environmental.planning documents, and wetland delineations, In addition to
<br />environmental aeivices,: Karma has also prepared stermwOtor pollution Prevention plans for private
<br />developments and public works improvements, and has cbriduotedWeekly and rain ovant inspections for
<br />.projects under the Statewide General Construotion Permit, Her responsibilities also Include coordination
<br />with the contractor through the construction process to.assure the gest Management Praolices controls
<br />are Installed and maintalned,:and that the site Win full compliance with the Permit. Karina is also: trained
<br />to measure pH and turoldity In the field during storm events, as required by the Permit for high risk sites.
<br />Professional Credentials
<br />Mester of'Soleho, Public Health/ Environmeh(a) tfeallh, Sah Diego State llntvorsity
<br />Bachelor of Science, Biological Sciences, University of Galifamla,.8ania Barbara
<br />Amadlaon Institute of Certified Planners, .(#420046)
<br />C:artifiad Professional in Erosion & Sediment Control (#7485)
<br />Relevant Experience
<br />A Civil Engineering Design Servieas - Santiago
<br />Detention Basin, Temecula, CA—
<br />Environmental Planner
<br />Intersection and prainage.lmprovements at
<br />Frank Sinatra Drive and Portols Avenue, Palm
<br />Desert, CA -- Environmental Planner
<br />.A San Diego County As -Needed Environmental
<br />Services, San Diego, CA — Project Manager
<br />San Diego Rlver Bikepath, Ocean Beach
<br />6lkepdth/Hotoi Circle North (aka Mission Valley
<br />Bikaway Feasibllity Study), San Diego, CA —
<br />Environmental Planner
<br />.A Main Street Promenade (Linear Park - A Street
<br />Vacatlon), Lemon Grove, CA •— Project
<br />Engineer
<br />A Bakersfield Master Plan Development (Meadow
<br />Field Airport) AKA Wingspolnt, Saiteref eid,. CA
<br />—Environmental Planner.
<br />i Bayshore Stkeway Environniontal
<br />Documentation.and Final Design, San Diego,
<br />CA --Environmental Planner.
<br />.f Santa Rosa Road Widening Project, Camarillo,
<br />CA-- Project. Engineer
<br />KimbnMorn
<br />.A City of Stockton, Installation of Emergency
<br />Vehlolo Pre-Ernption(EVP) at Various Locations,
<br />Steekton, CA --- Environmental Planner
<br />.A Del Dios Gorge Trak Feas(blilty Study,
<br />Escondido, CAS— [Environmental Planner
<br />A Douglas Park -Long Beach :(Boeing),, Long
<br />Damon, CA — Environmental Planner
<br />.A Faraday Avenue, Carlsbad, CAM --
<br />Environmental Planner
<br />• Harbor Boulevard Smart Street Feasibility Study
<br />and Environmental Documentation, Gordan
<br />Grove, CA- Environmental Planner
<br />• 1.245Nan Buren Blvd Interchange PA&ED and
<br />PS&E Phases, Riverside County, CA --
<br />Environmental Planner
<br />d 1.510anesse PRIED, PS&E and Construction
<br />Phase Services (CPS), San Diego, CA —
<br />Environmental Planner
<br />• Broodway.Plazo Expansion, Walnut Croak, CA
<br />--Environmental Planner.
<br />25E-136
<br />.S
<br />Cp
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />0
<br />Q, 9
<br />(,a;,
<br />3
<br />�j
<br />k.. F
<br />t
<br />,.t
<br />
|