Laserfiche WebLink
Chris Mserr, P.E., LEED AP <br />STRUCTURAL SERVICES - TASK MANAGER <br />Chris has nearly 15 years of experience on a variety of projects, Including building <br />structural and pavement assessments, parking facility design and repair, vehicular <br />and.psdestrian bridge, design and repair; culvert design,. roodwaylstreetscape <br />Improvements, and other ancillary transportation support structures. Citric' responsibilities have included <br />planning, structural design, production of plans and specifications, and construction phase services for a <br />wide range of project types. His design and assessment experience encompasses structures of <br />reinforced concrete, precast/ prestressed concrete, posttensioned concrete,. and structural stool for a <br />wide variety of project and client types. Chris also recognizes the correlation betwaen sustainability and <br />practicality and applies this to every project. <br />Professional Credentials <br />Master of and Bachelor of Scleinos, CMI Engineering, Clemson University <br />Professional Engineer In CA (00317), BC (028099), NC (#35111), TN (#0052713) <br />LE W AP (Leadership k1 Energy and Environmental Design) <br />American Society of Civil Engineers, Member <br />International Parking Institute, Advisory Council, Sustainabillty Committee, Consultants Committee <br />Green Parking Council, Crodentialing Committee <br />Relevant Experience <br />• Bayside District, 3rd Street Promenade <br />Downtown Parking Study, Santa Monica, CA -- <br />Project Engineer - , <br />• Firestone Boulevard Improvements, Buono <br />Park, CA— Project Manager <br />•'City of Anaheim, Gene Autry Way Improvements <br />(1-5 to State College Bivd.) & State College Blvd. <br />Improvements (West Side), Anaheim, CA <br />• Pavement Rehabilitation (Task Girder Under on - <br />Call), Pomona, CA --• Project Manager <br />• Traffic Flow Improvement Study of Artesia <br />Boulevard from 1.5 to Beach Boulevard, Buena <br />Park, CA -« Project Manager <br />• C Gold Line Design -Build Wayside. Energy <br />Storage Substructure (WESS) project, Los <br />Angeles, CA —Project Engineer <br />• Comprehensive Parking Analysis, Santa Ana, <br />CA — Project Engineer <br />• Califomla State University -Long beach, West <br />Campus Turnaround Drainage (Veteran Affairs), <br />Long Beach, CA — Project Manager <br />• City of Buena Padc, SR g1/Beach Blvd WB Exit <br />Ramp, Buens Park, CA --Project Manager <br />• Patton Street Pocket Park (Parks for People), <br />Los Angeles, CA — Project Engineer <br />• CSU Long Beach, Fast Campus Road - Safely <br />Improvements, Long Beach, CA — QC/QA <br />Ftenrlewer - <br />• Diamond Bar Prospectors Road Street <br />Rehabilitation Project, Diamond Bar, CA — <br />Project Manager <br />• fast Coast Highway Signal Rehab Design, <br />Newport Beach, CA — Project Director <br />• Valley Transportation Authority PARCS, Silicon <br />Volley, CA — Project Engineer <br />• Santa Fe Christian School Parking Dock, Solana <br />13each, CA — Project Engineer <br />• Benyessa Station Parking Structure, San Jose, <br />CA --- Project Engineer <br />• California State University, Sacramento Parking <br />Structure Condition Assessments, Sacramento, <br />CA —Project Engineer <br />• Lower Pacific Avenue Parking Study, Santa <br />Cruz, CA -» Project Engineer <br />• Milpitas Station Pedestrian Bridge over <br />Montague Expressway, Milpitas, CA — Project <br />Engineer <br />• Richmond TransitVlllageParking Garage <br />(BART), Richmond, CA— Project Engineer <br />25E-143 <br />Kimley»>Horn <br />