|
Chris Mserr, P.E., LEED AP
<br />STRUCTURAL SERVICES - TASK MANAGER
<br />Chris has nearly 15 years of experience on a variety of projects, Including building
<br />structural and pavement assessments, parking facility design and repair, vehicular
<br />and.psdestrian bridge, design and repair; culvert design,. roodwaylstreetscape
<br />Improvements, and other ancillary transportation support structures. Citric' responsibilities have included
<br />planning, structural design, production of plans and specifications, and construction phase services for a
<br />wide range of project types. His design and assessment experience encompasses structures of
<br />reinforced concrete, precast/ prestressed concrete, posttensioned concrete,. and structural stool for a
<br />wide variety of project and client types. Chris also recognizes the correlation betwaen sustainability and
<br />practicality and applies this to every project.
<br />Professional Credentials
<br />Master of and Bachelor of Scleinos, CMI Engineering, Clemson University
<br />Professional Engineer In CA (00317), BC (028099), NC (#35111), TN (#0052713)
<br />LE W AP (Leadership k1 Energy and Environmental Design)
<br />American Society of Civil Engineers, Member
<br />International Parking Institute, Advisory Council, Sustainabillty Committee, Consultants Committee
<br />Green Parking Council, Crodentialing Committee
<br />Relevant Experience
<br />• Bayside District, 3rd Street Promenade
<br />Downtown Parking Study, Santa Monica, CA --
<br />Project Engineer - ,
<br />• Firestone Boulevard Improvements, Buono
<br />Park, CA— Project Manager
<br />•'City of Anaheim, Gene Autry Way Improvements
<br />(1-5 to State College Bivd.) & State College Blvd.
<br />Improvements (West Side), Anaheim, CA
<br />• Pavement Rehabilitation (Task Girder Under on -
<br />Call), Pomona, CA --• Project Manager
<br />• Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1.5 to Beach Boulevard, Buena
<br />Park, CA -« Project Manager
<br />• C Gold Line Design -Build Wayside. Energy
<br />Storage Substructure (WESS) project, Los
<br />Angeles, CA —Project Engineer
<br />• Comprehensive Parking Analysis, Santa Ana,
<br />CA — Project Engineer
<br />• Califomla State University -Long beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />• City of Buena Padc, SR g1/Beach Blvd WB Exit
<br />Ramp, Buens Park, CA --Project Manager
<br />• Patton Street Pocket Park (Parks for People),
<br />Los Angeles, CA — Project Engineer
<br />• CSU Long Beach, Fast Campus Road - Safely
<br />Improvements, Long Beach, CA — QC/QA
<br />Ftenrlewer -
<br />• Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA —
<br />Project Manager
<br />• fast Coast Highway Signal Rehab Design,
<br />Newport Beach, CA — Project Director
<br />• Valley Transportation Authority PARCS, Silicon
<br />Volley, CA — Project Engineer
<br />• Santa Fe Christian School Parking Dock, Solana
<br />13each, CA — Project Engineer
<br />• Benyessa Station Parking Structure, San Jose,
<br />CA --- Project Engineer
<br />• California State University, Sacramento Parking
<br />Structure Condition Assessments, Sacramento,
<br />CA —Project Engineer
<br />• Lower Pacific Avenue Parking Study, Santa
<br />Cruz, CA -» Project Engineer
<br />• Milpitas Station Pedestrian Bridge over
<br />Montague Expressway, Milpitas, CA — Project
<br />Engineer
<br />• Richmond TransitVlllageParking Garage
<br />(BART), Richmond, CA— Project Engineer
<br />25E-143
<br />Kimley»>Horn
<br />
|