Laserfiche WebLink
Eduoatioit <br />R�,t7FiilEnglnsaring University <br />Of Oallibrnio, Indo <br />Clertifioation/l.ioanse <br />Prat"sional gnsinaar bA, UT <br />Areas.ofExpertise <br />• WaILEcipippingPlanning and <br />. <br />Neigh <br />• Pipeline'Pianningand Design <br />Pnijeot Management <br />Program Management <br />+ Projeet Delivery <br />+ OroundwateriOupply <br />• Pump Station Planning and <br />Design <br />RsservArStategb Planhing <br />andDeslgn <br />• piinkingWater <br />Experience <br />+ 23totalyoars <br />lgaarwithHazen <br />Professional Activities <br />AwWA,ASQE.AMTA <br />OA•NV AWWA, <br />CA Water Reuss Aoeoo, <br />Hazen <br />Cindy Miller, PE <br />Water/Waotewater Team Lead <br />�h <br />f <br />0 <br />M's: Miller has extensive experience in the <br />planning, clesign.and construction ofwatersupp.(y, .i <br />treat hent, storage and convoyanoe f eiiities. : <br />tier assignments have lncluded providing Progmtwmanagement seryl <br />for4iso uailtiongroundwatersupplyproject,whiehlucludesp1pelines, <br />wells, pump stations, and an advanced treatment systolu for RaRacoatrate reduction, PrrtjectManagerfot preliminaryandfinal design <br />a 28,8 GD mTerofiltratiott treatment faculty, and project <br />ioMGD R.A./lonSxchangegroundwatertreatmentplant..Ms..Millor: <br />also led nu merous waterstorage and conveyance infrawucture proj <br />Including design of over loo utiles of Ductile Trop, CMMC steel, P <br />and'HDPL pipeline., design of steel, pre -stressed concrete, and cast <br />place concrete storage reservoirs, 'tip toxo.million gallons, and numeron <br />pump station faeilitles..She has led feasibility and planning stttdt <br />developed ttieattrient%rroaess evaluations and life -cycle cost evaluatio <br />participated to value. onglneering studles and opetatiorui valuaticns <br />Sha has developed detailed designsofnuaay systems and provided'c <br />structibn and startup services. She has experience with different proj <br />delivery. methods Includingt design -bid -build, design -build and de- <br />slgn-bulld-operate-finance. <br />rr <br />Olty of Santa Ana Well 281mproveents Altema,tives Analysis, <br />Santa Ana, OA <br />Principal In Charge. The City of Santa Ana owns and operates Well <br />located at thesolltheasteorner of Plower Street First Street, adlace <br />to Cityowned tennis courts. well xo pumps directly to an existing It <br />reservoir, The existing well site Includes, the well head and dischar <br />piping assembly, .control equipment, a chlotination system In a bulld in <br />and an SCS transformer, An alternatives analysis was conducted tore <br />ommend upgrades at the site including site Improvements, structura <br />d <br />mechanical, and electrical upgrades. Highlights of the study inclu <br />developing three (3) alternatives for the Improved site, providing s <br />renderings for each site alternative, and developinga.preliminary opt <br />ton of probable cost for the design and construction of each alternati <br />discussed, The City Is moving forward with Implementing the rccona <br />mended alternative from this analysis. <br />25E-148 <br />