Laserfiche WebLink
Steven Oonnen K <br />is,00c acre -ft peryear, over 26 miles' of 12 -Inch to 484nch diameterpipe, a 2.65 MG welded steel reservoir, a <br />flaw control and recharge.faclltty tvlfh 40,000 gpm capaClty aitch up to ss5 psi.pressur0 drop,.a pump at <br />sized for 25,000 gpm wlthpumps Installed to provide ssi000 gpm, and four turnout flow control facilities for <br />delivering the water to member agencies. <br />tlifiower High Oapaolty Well, Oily of Bellflower, Bellflower, OA <br />I Frafecth4akxager. Proparcdapreltuntnarydesi�inreportandprovlaeiifinalengineeriugdesignandtanstruc- <br />tion management and Inspection services for the well drilling and equipping of the city's new high-capacity <br />groundwater well. The well Is designed to produce s,soo gallons per minute of high-quality groundwater to <br />replace alarge portion ofthe city'swater suppltes. Electrical design services Included a motor control center, <br />avariabie-frequencyArlvefor the well pump, Interior mid exterior fighting, an automatic transfer switch, and <br />an emergency dieselfueled generator. Control, design Included preparation of process and instrumentation <br />diagrams and specli4cation ofcantrol components to provide consistency with control components Installed <br />Ineslstingcity facilities, Providedengineeringsupport during testing and start-up ofthewell. <br />Wells 21 and 22 Wellhead Faollitles and Pipelines, Irvine Ranoh Water Distriot, Tustin, OA <br />Task Manager: Task managerresponslbleforthedesignefthewellheadfaciiitlesand untreatedwaterpipeline. <br />Deliverables Included plans., specifications and engineers estimates of probable construction casts for each <br />the wellhead facilities and ail pipelines, Weil 21 and Well 22, with capacities of 3,800.gpmand. 1,600 gpiu re- <br />spectively, pre submersfbleturbine pump / motor assemblies, Iustalledwithinvaults, and one well is equipped <br />with abladder-type surgetank. Project lucludodn000 ft. Of 244Uch steel untreated water pipeline, i3,600 <br />feet of 36 -Inch steel product water pipeline and 1,700 LF of 10 -Inch IDPE brine concentrate pipeline. The <br />pipelines required jack -and -bores to cross the OCTA Metrolink train tracks, an orange County Flood Control <br />District channel, BNSF train tracks, a box culvert, and Peter's Canyon Channel. <br />Rehabilitation of College Avenue Pump Station, Orange Oounty Sanitation DIstriot, Oosta Mesa, OA <br />Engineer. Provided engineering services to orange County Sanitation District for rehabilitation of College <br />Avenue Sewage pump Station, Provided engineering and construction support services for the rehabil Patton <br />ofthe College AvenueSewage Pump Station, The design included replacement ofpumping equipmentwlth new <br />dry -pit submersible pumps, structural rehabilitation of the wet -pit and dry-plt, a new ventilation system, a <br />new odor controlsystem, a new discharge valve vault for Interconnecting dualforce mains, and a new concrete <br />block building for the electrical equipment and controls. The design Includedreplacement: ofpumping equip- <br />ment with new submersible pumps and a new concrete block building to house the new electrical equipment <br />and controls, <br />Reconstruction of the Los Alamitos Pump Station and Retarding Basin, Countyof Orange, OA <br />Pump Station Technical Advisor. Prepared plans, specifications, and estimates for anew Boo cls storm <br />water pump station with natural gas engine, driven pumps to replace the existing Los Alamitos facility <br />for the County of Orange. Work included final design for the pump station facility and retarding basin, <br />preparation of a value engineering report, final engineering report, hydrology and hydraulic routing, best <br />management practices for Improvingwater quality, inspection and analysis of existing 2,400 lineal foot of <br />544nch discharge piping, Phase I and It environmental assessments, geotechnical Investigation, CEQA, and <br />permit processing, and coordination with agencies and homeowner associations. The pump station Includes <br />four vertical mixed flow pumps with a design capacity of 129 MGD each. Each pump Is driven by a 15oo hp <br />dual -fuel engine (natural gas and propane). Engine related components include a compressed air starting <br />system, primary and secondary Jacket water cooling system, natural gas primary fuel system, and prova ne <br />25E-150 <br />