My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON-CALL ENGINEERINQ SERVICES <br />WwwrW owm-OMbnA <br />static water level have remained consistent; and/or the well begins to pump send and/or gravel <br />pack, or even. displays large amounts of entrained air in the pumped dlscharge. <br />The causes for these observed conditions can. be due to many reasons; incI40Ing: "pump, motor, <br />and/or electrical prcblitins, resulting In decreased production rates; biological foullino of the <br />perforations and.grovel pack, resulting in plugged conditions, thereby decreasing the production <br />rate and spedific capacity and deepening of the pumping levels, and even loss of pump <br />efficiency; and/or development of holes in the well casing and/or enlargement of the <br />perforations, resulting in the production:of sand. <br />When conslderlog wail rehabilitation; site.-speolfladata from the well in question needs to be <br />evaluated to determine what could be causing the observed conditions. Therefore, it is <br />Imperative to Obtain and review available data on both historic and current values for: statfo,and <br />pumping water levels; water quality; specific capacity; well construction records; previous wall <br />rehabilitation work, production rates; and video logs, etc. Only through"revlew of such data"by <br />qualifier. hydrogeoiogists Can the potential reason(s) for the decreases in well Iperformanoe and <br />the Idehtiffoatlon of rehabilitation steps be defined, <br />It is understood That the subject of the Santa Ana Water Project Is reported as "being 34 years <br />old and Is currently producing sand. Because it is constructed of low carbon steel the: casing <br />may be reaching near the end of Its useful Ilfe. and further operations may lead to complete <br />failure, e.g., by a potential casing collapse, However,. the life of the existing well could be <br />extond6d eornewhat longer by the installation of full, stainless-steel' liner casing In the well and <br />this is.the prime recommended course of action that can.now be undertaken on the well, <br />The proj%t can be approached iii One of two ways by the:Clty. An initial approach, and one that <br />Is less efficient, is to conduct this Initial work as part of a prepared set of Technical <br />Specifications where all rehabilitation options are included. However, a second, and more <br />efficient approach, would be for the City to contract with a well rahabilfjaflon Company to <br />conduct Initial Investigatory operations on the well to determine the eurrent downhole conditions <br />In the well. This would Include conducting an Initial short-term pumping test to obtain the <br />current, pro-rehabliltation specific capacity of the well. This would be Immediately followed by <br />removing the pump and running a down -wolf video survey to determine the observable condition <br />of the casing and the perforations, and depth of the sand In the well. This would be a preferred <br />approach, because by determining the current Condition of the well, a set of Technical <br />Specifications can be prepared with the necessary rehabilitation operations already provided. <br />This is the approach that Tetra Tech is using on the Well No. 32 Rehabilitation Project for the <br />laity. <br />The tasks for this preferred initial approach would be as follows: <br />I . Following removal of the pump motor, column and bowls from the well, Inspect and <br />measure all apparatus (conducted by the contractor In the field and at the pumping <br />contraotor's shop). <br />2. Sound the bottom of the casing to determine the current amount (and type) of sediment <br />fill and then ball that sediment from the bottom of the casing; examine the collected <br />sediments and possibly conduct laboratory analysis. Check carefully for the possible <br />presence of gravel pack and/or formation sand in the bailed material. <br />3, Perform a current video survey of the well to determine the depth to which sand has <br />filled the well; check for possible holes in the casing, and the possible extent of plugging <br />of the perforations. <br />City of Santa Ana .9_ T97"RA TEEM <br />25E-174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.