Laserfiche WebLink
ON-CALL ENGINEERING SERVICES <br />VhOrtiexnu-OpiWAA <br />Pipeline Experience <br />During the last 16 years, our project team fres been involved In the design of more than 100 <br />miles of water, recycled water, and sewer mains within fully developed areas having extensive <br />traffic control and utility conflicts, On Page 6 of our Cin -Dail Engineering Sorviaes 800, <br />submitted to the Oily on October 26, 2017, Is a list of many pipeline projects designed by our <br />project team. <br />City of Senta.Ana Experience <br />We believe that our best reference of our expedenoe is our past. performance on projects that <br />we have Completed for the Clty: We are confident that these pest projects with the Cfty'wlfl <br />afkast to our technical Excellente, responsive staff, and our-cornpWo understanding of the Guy's <br />facilities. <br />Summarized below is &'quick summary of Nie applicable projects that Tetra Tech has previously <br />dofnpieted for the City: <br />• hump StatlonlWeil Projects - South Station Modifications, Well No, 34 Modtficationsi Well <br />No. 39 and Well No. 361 Weil No. '24electrical upgrades, and Well No: 32 Rehabilitation <br />• Water Main Replacement Projects* Bristol Street Widehing, Centennial Park, Warner <br />industrial, Mid City, Plct-Lowell anti Central City Water Main Replacements <br />• Sewer Main Replacement Projects - Westminster and McFadden Sewer Replacements <br />• Litt Station Projects - Sari Lorenzo and Maxine Lift Station Emergency Bypass <br />We ark committed to providing the City with the same high quality service that we provided on <br />these previous projects. <br />Similar Projects <br />"flip following are three projects that are similar to the sample project: <br />Mid -Basin Injection Centennial Park Project (OCWD); These factIlties include tour (4) <br />submersible bookflush pumps and motors within a vault structure, The main relevance is <br />that DCWD. was drilling and equipping well faelliWs within the City of Santa Ana (Centennial <br />Parka and our services included obtaining the necessary City Permits. <br />• Elizabeth Reservoir and Booster pump Station and Water Well No. 29 (City of South <br />Gate)r This project included the design of the drilling and equipping of Well No. 29, <br />corresponding disinfection equipment and replacement of several thousand feet of pipe. <br />Well No. 27 Drilling and Equipping f0ity of Orange), This project Included the well <br />drilling and well equipping of .a new potable water well, Including an electrical and chemical <br />building for sodium hypochlorite treatment. <br />The requested contact Information Is included on the following page (Client References), <br />SCHEDULE <br />Tetra Tech has the necessary resources to rapidly deploy and meet an aggressive project <br />schedule, In addition, our project team has recent well experience that places our team high on <br />the Issues resolution learning curve. On the next page, we have Identified the key schedule: <br />City of Santa Ana • is • TETRA TECH <br />25E-183 <br />F <br />