|
OTETRATECH
<br />Astrid Fleischer is an electrical and controls_ systems engineer With
<br />28 years of experience in water and wastewater treatment, capital
<br />Improvement and industrial control projects, Me Fleischer's electrical
<br />and controls design experience includes projects in California end
<br />overseas_ involvingg ModiCon Quantum Automation Platform,
<br />Siemens Simatto. PLQs, Allen Bradley RSLogix6000 programming,
<br />installation and support services for Wonderware Wouch 14M],
<br />Wondorware Active Factory, Wohderware Historian, installation and
<br />maintenance of Marathon Endurance. V17virtual Redundant Server
<br />Systems, $NMP Network Management Implementation and
<br />integration Into Plant HMI and network design, configuration and
<br />troubleshooting Additionally, Astrid Is proficient in standard
<br />oonfjgilrotion of $dhneider Mediric Network Infrastructure Devices
<br />(Fiber.OpUo Repeaters,-Swi(oher,), interface programming for
<br />Prollbus DP and .dosjgn.and iniegration of Prooeas Control
<br />Application Interfacing with Variable Prequency Drives (VFDs).
<br />EXPERIENCE
<br />SCADA System Project, West Basin Municipal Water District,
<br />Carson, CA 1&0 Engineer— Specified the project's network
<br />equipment and technology (413 cellular) as well as the SCADA
<br />application software (SCADA Expert ClearwCADA) for the new
<br />SCADA network.
<br />Daly Viiater Treatment Plant, City. of San Diego, CA — Project
<br />Engineer — Plant upgrade included .chlorine dioxide generator and
<br />contactor, pumped backwash, new flocculation and sedimentation
<br />basin, replacement of filters; SCADA system upgrade. Designed
<br />and programmed the PLC and the Wonderware HMI application for
<br />filter level control and automated backwash sequence. Developed a
<br />comprehensive model of the plant in PIC$ Simulation Software to
<br />use for an in depth system test and simulation. Simulation of all lD
<br />points and modeling of all controlled systems reduced start-up time
<br />by an estimated 80 percent.
<br />Pyrite Canyon Treatment Facility, State of California,
<br />Department of Toxic Substances Control Glen Avon, CA — I&C
<br />Engineer �- Reviewed instrumentation & Centrol and Electrical
<br />Submittals from vendor supplied packaged systems such as filter
<br />presses, bag presses, air compressors, booster pumps, inclined
<br />piste clarifiers, flocculating clarifiers and others.
<br />Alamitos Barrier Tetometry System Upgrade, County of Los
<br />Angeles Department of Pub, lic Works, Los Angeles, CA I&C
<br />Engineer— Specified the project's Siemens 57.1200 control system
<br />and network equipment, Designed the project's control and
<br />instrumentation panels including panel load calculations and design
<br />of the photovoltaic power supply for the control panels. Prepared
<br />project documents such as conduit schedules, project drawings and
<br />project specifications.
<br />Pnne i
<br />25E-213
<br />Astrid Fleischer, PE
<br />SCADA
<br />Education:
<br />Professional Engtneer.in
<br />Control System Engineering
<br />(PE), California
<br />Badhelor of Sdenoa
<br />Electrieai Engineering
<br />'University of Nuremberg,,
<br />Cemiony
<br />Vocafions(coliege for
<br />Electrical Eng(neering and
<br />Date Systemsi Technology
<br />Erlangen; Germany
<br />RaglstratlordOertlfication:
<br />Registered Prefaaaional
<br />Enginoar to Control.
<br />Systems, California No. CS
<br />7440
<br />Office.,
<br />Irvine, Cdr
<br />Years of Experience:
<br />26
<br />Years with Tatra Tech:
<br />Two
<br />Key Areas of Experience:
<br />Process control design,
<br />implementailon,.start-up and
<br />maintenen,4 seivicas
<br />Project management,
<br />process, control review and
<br />consultant services
<br />Project Lead Engineer
<br />Programming, installation
<br />and support services
<br />
|