Laserfiche WebLink
OTETRATECH <br />Astrid Fleischer is an electrical and controls_ systems engineer With <br />28 years of experience in water and wastewater treatment, capital <br />Improvement and industrial control projects, Me Fleischer's electrical <br />and controls design experience includes projects in California end <br />overseas_ involvingg ModiCon Quantum Automation Platform, <br />Siemens Simatto. PLQs, Allen Bradley RSLogix6000 programming, <br />installation and support services for Wonderware Wouch 14M], <br />Wondorware Active Factory, Wohderware Historian, installation and <br />maintenance of Marathon Endurance. V17virtual Redundant Server <br />Systems, $NMP Network Management Implementation and <br />integration Into Plant HMI and network design, configuration and <br />troubleshooting Additionally, Astrid Is proficient in standard <br />oonfjgilrotion of $dhneider Mediric Network Infrastructure Devices <br />(Fiber.OpUo Repeaters,-Swi(oher,), interface programming for <br />Prollbus DP and .dosjgn.and iniegration of Prooeas Control <br />Application Interfacing with Variable Prequency Drives (VFDs). <br />EXPERIENCE <br />SCADA System Project, West Basin Municipal Water District, <br />Carson, CA 1&0 Engineer— Specified the project's network <br />equipment and technology (413 cellular) as well as the SCADA <br />application software (SCADA Expert ClearwCADA) for the new <br />SCADA network. <br />Daly Viiater Treatment Plant, City. of San Diego, CA — Project <br />Engineer — Plant upgrade included .chlorine dioxide generator and <br />contactor, pumped backwash, new flocculation and sedimentation <br />basin, replacement of filters; SCADA system upgrade. Designed <br />and programmed the PLC and the Wonderware HMI application for <br />filter level control and automated backwash sequence. Developed a <br />comprehensive model of the plant in PIC$ Simulation Software to <br />use for an in depth system test and simulation. Simulation of all lD <br />points and modeling of all controlled systems reduced start-up time <br />by an estimated 80 percent. <br />Pyrite Canyon Treatment Facility, State of California, <br />Department of Toxic Substances Control Glen Avon, CA — I&C <br />Engineer �- Reviewed instrumentation & Centrol and Electrical <br />Submittals from vendor supplied packaged systems such as filter <br />presses, bag presses, air compressors, booster pumps, inclined <br />piste clarifiers, flocculating clarifiers and others. <br />Alamitos Barrier Tetometry System Upgrade, County of Los <br />Angeles Department of Pub, lic Works, Los Angeles, CA I&C <br />Engineer— Specified the project's Siemens 57.1200 control system <br />and network equipment, Designed the project's control and <br />instrumentation panels including panel load calculations and design <br />of the photovoltaic power supply for the control panels. Prepared <br />project documents such as conduit schedules, project drawings and <br />project specifications. <br />Pnne i <br />25E-213 <br />Astrid Fleischer, PE <br />SCADA <br />Education: <br />Professional Engtneer.in <br />Control System Engineering <br />(PE), California <br />Badhelor of Sdenoa <br />Electrieai Engineering <br />'University of Nuremberg,, <br />Cemiony <br />Vocafions(coliege for <br />Electrical Eng(neering and <br />Date Systemsi Technology <br />Erlangen; Germany <br />RaglstratlordOertlfication: <br />Registered Prefaaaional <br />Enginoar to Control. <br />Systems, California No. CS <br />7440 <br />Office., <br />Irvine, Cdr <br />Years of Experience: <br />26 <br />Years with Tatra Tech: <br />Two <br />Key Areas of Experience: <br />Process control design, <br />implementailon,.start-up and <br />maintenen,4 seivicas <br />Project management, <br />process, control review and <br />consultant services <br />Project Lead Engineer <br />Programming, installation <br />and support services <br />