Sub-TaskV pry trYfitlas — Undergrounding existing powerllnes is possible if SCE accepts proposed switch locations. As described in the <br />approach coordination with SCE would occur In two phases. Our current scope is limited to street design. HZ will coordinate with third party ; <br />purveyors to find feasible alignments for dry utility. The proposed alignment would be incorporated into a conflict exhibit for evaluation. The (IN <br />coordination is limited tothe street improvement design period. <br />Sub TasklBSpanlXnatlons—HI will utilize Cttyof Santa Ana standard bid specifications and/or the latest edition of the Standard Specifications <br />for Public Works Construction and edit them to fit the project requirements.") <br />Sub.Task! 9 €stlmates afftbable Cost— IIZ will prepare estimates of probable cost forthe proposed Improvements. <br />Sub-TaskA1811blyPlans- HZ will prepare utility plans this Includes an option for potholes to investigate existing utility size and depth. Further s <br />Investigation will be necessary where record information is unreliable and thought to cause a conflict with proposed improvements. Existing j <br />manholes will be dipped where possible to verify Inverts and pipe size. Notices will be sontto Impacted utility companies and every effort will be [v.;l <br />made to resolve conflicts prior to 60% submittal,, <br />Sub-Taskl.li pispesitionPlans— Removals are limited to infrastructure within project limits <br />Sub -Tasks 12 WaterWisfiRshabllliatlonPlan i <br />Sub -Task J. 13Diisits AmprovementPlaits -Excluded (; <br />Option A: Typical Street Improvement set will include; Option B. Typical Street improvement set will Include: . <br />1. Title Sheet 1. Title Sheet 9. Signing & Striping Details) <br />2, Index Shoot 2. Index Shoot 10, Sound Wall Plan - (3 sheets)) <br />3, Disposition Plan 3, Disposition Plan 11. Sound Wall Details <br />4. Street Plans (If Required) 4. Street Improvement Plans (5 12, Streetlight Plan (3 sheets <br />5, Utility Improvement Plans (2 sheets) sheets) double stacked) <br />6, Water Well Rehabilitation Pian 5. Details & Typical Cress 13. StreatlightDetails (i <br />7, Details and Typical Grass Sections Sections 14. landscape & Irrigation Plan (3 <br />6. Storm Drain Improvements—(2 sheets -double stacked) C� <br />sheets) 15, landscape & Irrigation Details <br />7. Drainage Details �) <br />B. Signing & Striping Plans (3 <br />sheets -double stacked) <br />C) <br />TASK I(; Construction Administration Services(Optional) 0 <br />Sub -Task X 1 Bid Support-- HZ will be available to attend the pre-bid meeting, Our team will review contractor's RFls If requested by the City (,) <br />during the bidding ph ass, <br />Suh-Task U tonstructlenSuppert— HZ will participate in construction meetings if nacessaryNZ-will review submittals and shop drawings ` <br />requl red to support the construction contract, Reviews will be completed within 10 working days of receipt, Contractor change orders will be �. <br />completed within two working days of receipt. HZ will be available as requested bythe City to resolve discrepancies in contract documents. HZ <br />l will furnish nscessary revisions to documents due to orrors and/or omission at no cost. T <br />Sub -Task X3 Record Drawings—The contractor shall provide as -built redlines, HZ will revise approved plans per contractor comments to ' :^ <br />produce record drawings. <br />Sub-1sskX,4Pro/#ot Close -Ont - HZ will assist In the development of the project punch list as related to the construction pockage prepared by <br />ourteam, <br />f� <br />HUITT' ZOLKRS City of Santa Ana Civil Engineering Services; RFP 17-083 18 % <br />25E-242 <br />