|
HUITTZOLLARS
<br />(S EL HERNANDEZ,PE, PLS, QSD
<br />Project Manager - Huitt-Zoilars
<br />Miguel Hernandez has more than 20 years of experience in Public Works and is proficient with the design of
<br />streets,highways,sewer,water, storm drain, grading, hydrology and hydraulics. His experience combined
<br />with his ability to communicate will make him a valuable asset to a project. As a Project Manager he
<br />will be helpful in coordinating all design inclinations and finding the appropriate balance. When critical
<br />deadlines need to be met his proven ability to work under pressure will be invaluable.
<br />RELEVANT PROJECT EXPERIENCE
<br />Mojave Solar project - Hinkley, CA
<br />Ensure all construction work conformed to applicable LOSS, coordinated traffic detour plans, reviewed
<br />OSP activities, prepared documents to initiate revisions to approved drawings, responsible for work load
<br />reports and monitored progress of construction schedule. The project moved over 750,000 GY of soil
<br />during the grading activities that required coordination with survey crows and grading contractor. To
<br />protect the site from large storm events and balance dirt moving activity 18,000 LF of channel were cut,
<br />The solar plant included rehabilitation of six existing water wells and drilling of four now water wells.
<br />Six existing water welts were used for construction water. After construction, two large existing wells
<br />were retrofitted and connected to four now water wells to provide water for domestic and power plant
<br />use. The two power plants Included four water tanks total.
<br />Farragut Avenue Improvements - Morena Valley, CA
<br />Hernandez was the Project Manager for improvements that included sidewalk, curb, gutters, driveways,
<br />drainage, access ramps, utility adjustments, short property walls, missing street lights, pavement
<br />repairs, and accommodation of upgraded water line (built in advance by BSMWC) in order to enhance
<br />safety and accessibility for commuters and pedestrians on Farragut Avenue from Sherman Avenue to
<br />Ellsworth Street.
<br />Jeffrey Road/Portola Parkway Street Improvements . Irvine, CA
<br />Hernandez was the Project Manager for the civil design and survey of a new alignment of 1.5 miles of
<br />Jeffrey Road and 1.0 mile of Portola Parkway. Work included roadway rehabilitation, electrical conduits,
<br />cable/telephone improvements, right-of-way engineering, potholing, and grading. Work also included
<br />preparation of infrastructure plans, including storm drain design, 72-inrhesto 10 -inches in diameter
<br />over 10,000 feet of pipe, hydrology and hydraulic calculations, sewer plans, dry utilities, specifications,
<br />and construction cost estimates. Jeffrey Road and Portals Parkway were designed for a six -lane highway
<br />with raised medians, new curb and gutter to replace open ditch channels, pedestrian undercrossing.
<br />Cerritos Avenue Gap Closure - Anahelrn, CA
<br />Hernandez was the Project Manager for this project located on Cerritos Avenue from Euclid Street to
<br />approximately 600 feet east of Euclid Street, The project constructed a five foot wide ADA compliant
<br />sidewalk and new storm drain laterals with catch basins. The work also included the construction of
<br />block walls and fences. The now sidewalk eliminates the need for pedestrians to walk along the side of
<br />the road. Cerritos is designated as a four lane secondary arterial by the County's Master Plan of Arterial
<br />Highways (MPRH) with average daily traffic of 9,400 vehicles per day. The project will provide a safer
<br />and better access for the school children and pedestrians in general. The services included right of way
<br />acquisition.
<br />Sae Sectlan E Relevant Project Experlence for additional projects.
<br />25E-250
<br />City of Santa Ana Civil Engineering Services; RPP 17-083
<br />t
<br />�f
<br />
|