Laserfiche WebLink
March 20, 2018 <br />Mr. Armando Fernandez <br />CIV of Santa Ano, Public Works Agency <br />20 Civic Center Plaza; 3rd Floor Reception, Ross Anoaz <br />Santa.Ana, CA 92701 <br />; <br />REI Ruafll oallons Proposalfor RFR No. 17.983 <br />City of 8onta AnTDO-Gait EpglnaaringSarvicas <br />i .Mt. Femandez, <br />Huitt-Zpllars, Inc, 047)lies been serving to Orange: County for more than 30yearsand looks forward tocontinuingthis relationship by suppprtingthe <br />p City of Santa -Ana raith.Ou=OaR Engineering Services. HZ Is afull-service'.ArchHectura-Eiiginhalfng firm trith:quahfiiid statf.capabloof Completing <br />the assigomonte described in the Water Resouroes.and General Eng►nearing (Options A and, 9). <br />Our recent pmaect.compiations and ongoingprojects highlighted in this proposal demonstrate our toniM direct experfence and well planned cost- <br />; effective approach with Public Works assignments, Our team has served Orange, Apglreim; Fullerton, Huntington ilnob, Loguna Hills, Laguna <br />Niguel, Mission[Viejo, Santa Ana, San Clemente, San Juan Capistrano, Yorbe Linda, Long Beach, Chino, Foutena, Ontario, Calobases; hod Thousand <br />Oaks. _ <br />; <br />Out Project Manager Miguel A. Nernandez,,PE, PLS, ASO brings a proven record In multi -disciplinary engineering assignments with Public Works <br />entities. He served as Resident Engineer in the Mojave Solar Projpot that built two power plants, The power plants required, sewer and water <br />Improvements Including rehabilitation of several existing water wells, He also worked on theaward-winning Lo Path Avenue Gap Closure for Orange <br />County Pubfio Works. Miguel understands the Importance of proactive communication and quality control in the timely delivery of a project. He will <br />be assisted by offer In-house professionals showcased In the too experience section of this proposal. <br />Cur team Is dedicated to.providing high•quslify products to the City of Santa Ana. This proposal is signed by an officer with authority to bind the <br />company. .Should you have any questions, please fool free to contact Miguel Heroandoz at,mhornandez@huitt-zollars.cam or at (949) 988.5315 <br />Extension 11169. <br />Sincerely, <br />HUITT•ZOLLARS, iNG,� jJ <br />Marc Hasiinger, PE <br />Office Manager / Vice -President <br />CAPE No. 99158 <br />N1.111TZQLM <br />Miguel Hernandez, PE, PLS, OSD <br />Project Manager <br />CA PE No. 61378 <br />Cit of Santa Ana Civil Engineering Serviced RFP 17-083 t <br />25E-274 <br />