My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nuitt-Zoilars is leading a multi -disciplined team In the preparation of an overall Master Pian and Phase 1 construction documents for a <br />new 500 -acre national cemetery for the U.S. Department of Veterans Affairs (VA). The construction budget for Phase 1, including a "fast- <br />track" initial Phase IA, is $15.6 million. MZ is providing civil, structural, mechanical and electrical engineering, and plumbing design, and <br />is coordinating the cemetery planning, architecture, landscape architecture, irrigation design, gootechnical and environmental services, <br />and cost estimating. This cemetery will be one of six now cemeteries added to VA's 126 existing national cemeteries. Phase 1 construction <br />will include a Public information Center/Administration Building, a Maintenance Building and yard, an assembly area, a committal shelter, <br />and internment areas for 1,700 traditional casket burial sites, 4,000 pre -placed concrete crypts, 500 in -ground eremain burial sites, and <br />$,000 columbadom niches. The challenges of this complex, large-scale project included optimizing grading with geological conditions and <br />constraints; preparation and processing of an environmental jurisdictional determination with USACE and CDFO; coordination of utility service <br />extensions from a proposed water well to the site; and developing landscape planting and irrigation strategies to optimize use of the limited <br />supply of available groundwater. <br />;YV OIl:V If LPGIJ: <br />• Water Well Design <br />• $ewer Design <br />• Domestic Water Design , <br />• trrigationWater Design <br />Hl.tITT—Z /LLARS <br />City of Santa Ana Civil Engineering Services: RFP 17-083 11 <br />25E-281 <br />
The URL can be used to link to this page
Your browser does not support the video tag.