|
HUITr-ZOLLAIRSic
<br />SAM GUHA, PHD, PE, GE
<br />Geotechnical Ninyo & Moore
<br />Dr. Guha Is a Principal Engineer with Maya & Moore with diverse professional experience in geotechnical
<br />engineering design, consulting, construction, and regulatory practice. Dr. Goho coordinates and conducts
<br />geotechnical evaluations for commercial, Industrial and public facilities, including airports, bridges,
<br />highways, railroads, levees, public and private buildings, various plants (e.g., water treatment, bio-rotming,
<br />power), pipelines, reservoirs, retaining structures, and elevated, at-grado and below -grade tanks; provides
<br />guidance on various analytical and numerical procedures that are undertaken fora project Including seismic
<br />hazard analyses (e.g., ground motion, liquefaction, dynamic settlement, lateral spread, ground subsidence,
<br />landsliding, etc.), site-specific response spectra analyses, slope stabilityranalyses, analyses of soil settlement,
<br />bearing capacityand earth pressures, assessmentof adverse effectsof collapsible soil and expensivesoll, and
<br />development of structural foundation, pavement sections and underground pipeline design criteria; provides
<br />gootechnIcall design parameters and recommendations for shallow and deep foundations, temporary and
<br />permanent retaining structures, slope stabilization techniques, mechanically stabilized earth (MISE) walls,
<br />tieback anchors, soil nails, in-situ ground romedlation and earthwork: prepares and reviews geotechnical
<br />reports, proposals and transmittals; reviews laboratorytest results, project plans and specifications; provides
<br />supervision and technical support to project- and staff -level engineers and geologists, conducts quality
<br />ossurance/quality checks, and performs project administration and management.
<br />RELEVANT PROJECT EXPERIENCE
<br />Orange County Water District, Smith Basin - Villa Park, CA
<br />Burris and Lincoln Basin - Anaheim, CA
<br />Hester Basin/Twin Lakes Park, Proposed Pump Station and Basin Grading, Geriteohnical Evaluation -
<br />Garden Grove, CA
<br />f
<br />1-10 Replacement of the Ellis Avenue Pump Station, Orange County Sanitation District - Fountain Valley, CA
<br />Reclaimed Water Reservoir for Moulton Niguel Water District - Allso Viejo, CA
<br />Effluent Pump Station Annex — Job No. J-77, Orange County Sanitation District Plant No, 2 - Huntington
<br />Beach, CA
<br />Now Lateral Extension for Castaic Lake Water Agency - Santa Chirita, CA
<br />N1,
<br />Chula Vista Power Plant Modernization - Chula Vista, CA
<br />JESUS "FREDDIE" OLMOS
<br />Fnvirolimental ECORP
<br />Freddie Olmos has more than 20 years of experience In Eaviornmenal Engineering and is proficient with
<br />environmental undertaking of the design of streets, basins, sewer, water, storm drain, grading, and public
<br />works projects.
<br />,J
<br />RELEVANT PROJECT EXPERIENCE
<br />West Street and Citron Street Sidewalk Gap Closure project- Anaheim, CA
<br />Lincoln Avenue Widening Project - Anaheim, CA
<br />La Palma Avenue at East Street Sidewalk Gap Closure Project - Anaheim, CA
<br />State College Boulevard and Lo Palma Avenue Intersection Improvement Project - Anaheim, CA
<br />i.
<br />J
<br />c
<br />City of Santa Ana Civil Engineering Services; RFP 17-083
<br />25E-304
<br />
|