Laserfiche WebLink
CSG PROPcsAI.TOSANTAANA <br />MILEONEPROJECT <br />March 20, 2018 r <br />ArmandoFernandez <br />Project Manager <br />City of Santa Ana <br />Public Works Department <br />20 Civic Center Plate <br />SantaAnp, CA 02701 <br />Rel kid No. 49.089 r3anara}Eng}neeriatg.bther than Water RtWurcps — Dptlan.tl (Mlle One Prnjeet) <br />CSG Consultants, Inc. (CSG) is pleased to present our proposal to provide engineering services for Mile One <br />Street Project. Our proposed team has pnpssortinent of project management skills' anti relevant experience <br />in roadway assessment & design, complete street, pavement management, Caltrans local assistance, traffic <br />slgnal design, btkewaydesign, public outreach, Bad federal grant adJninistratlan. CSG has provided 41miter <br />services for Many munlclpalltlesthroughout California. We have developed a great understanding for the <br />municipalities' needs and axpadetlons, and have experience collaborating with Citles'staff to ensure <br />successful delivery of the.projact. <br />Peykan AbbasA, PE, principal Engineer, will servo as the Principal [A Chaptte end project Manager for this <br />Contract, <br />Peykan Abbassi, PE, 1 Project Manager <br />8707 W. Garden Grave Dtvd., Suite 100 ) Orange, CA 9296.8 <br />phone(714)568.10101 l peykanaV@.csgengrcom <br />Mr, Abbassl brings over 92 years of engineering management experience for public works projects In both <br />munlotpal government and translt;pgencles. W Abbassi previously servers as the Project Managerf Egad <br />Enpfneer representing the City 4f Los Angeles for UP011(construction phase), and Regional connector <br />(p'relhnlnary design phase). The work included establishing communication protocols and procedures to <br />respond proactively during Inherently fast -paced design -build project development and construction. Having <br />performed Project Management tasks similar to the requirements for the City's project has provided Mr. <br />Abbassi with the hands-on a)(0arlence and knowledge required to deliver a successful project. He has <br />managed design and construction of many infrastructure projects for the City of Los Angeles, City of Half <br />Moon Day and North County Transit District. <br />CSG has teamed with Geo-Advantec, Wagner Engineering & Survey(WES), Summers/Murphy & <br />Partners(SMP), and Transpo Group. Geo Advantec will assist the team with ail soil and pavement.related <br />testing and reports, Wagner Engineering will provide surveying services, SMP Inc. will perform landscape <br />architecture, and Tronspo Group will assist the project with all required traffic studies, <br />We are excited about the opportunity to serve the City of Santa Ana and would welcome the opportunity to <br />talk with you further. As President, i am empowered to negotiate the contract on behalf of our firm. If you <br />have any questions or need additional information, please contact Mr. Abbess) at peykanm@csliengr,com or <br />(714)568-1010. <br />srncereiyl� <br />Cyrus Klanpour <br />President, CSG Consultants, Inc, <br />CS11.71 <br />OONSULTANTa <br />3707 West Garden Grove Blvd, #100, Orange, CA 92868 <br />phone (714) 568-1010 l fax (714) 568.10281 www.csgengr.com <br />25E-318 <br />