|
Professional On-call Engineering Services City of Santa Ana
<br />RFP No. 17.089
<br />symomm
<br />4. References
<br />Noe Negrete, PE, Director of Public Works/City Engineer
<br />Agency: City of Santa Fe Springs
<br />Phone: (562} 409.7611 Email• noenegrete@santafesprings.org
<br />Names of Projects: Parkmead Reconstruction, Citywide Pavement and Sidewalk Evaluation
<br />Description of Services Provided: Survey, field work, reports, street and utility PS&E, geotech, cost
<br />estimates, traffic, WQMP, storm drain
<br />Sean Crumby, PE, Deputy Public Works Director
<br />Agency: City of Long Beach
<br />Phone: (562) 570.6383 Email: Sean.Crumby@LongBeach.gov
<br />Flames of Projects: Santa Fe Rehabilitation, Seaside Storm Drain, East 201" Street Intersection
<br />Improvements, 6th Street Storer Darin
<br />Description of Services Provided: Aerial mapping, design survey, cross-sections, geotech, street and
<br />storm drain PS&E, traffic planning and engineering
<br />Rowena Jarcia, PE, Associate Engineer
<br />Agency: City of Anaheim
<br />Phone: (714) 765.4913 Email; RJarcia@anaheim,net
<br />Names of Projects: La Palma/state College Intersection Improvements
<br />Description of Services Provided: Aerial mapping, design survey, cross-sections, legal descriptions and
<br />plats, geotech, street and storm drain PS&E, wall design, traffic planning and engineering
<br />Mark Trestlk, PE
<br />Agency: City of Laguna Reach
<br />Phone: (949) 497.0300 Email: mtrestik@lagunabeachcity.net
<br />Names of Projects: Broadway Pedestrian and Safety improvements, Hillcrest Sidewalk, Park Avenue
<br />Sidewalk, Storm Drain Master Plan, Temple Hills Sidewalk
<br />Description of Services Provided: Design survey, cross-sections, geotech, street and storm drain PS&C,
<br />sidewalk PS&E, wall design, traffic planning and engineering
<br />5. Scope of Work
<br />PHASE 1: PRELIMINARY ENGINEERING
<br />Rggearch and Field Reytew.
<br />A thorough search of the available records will be conducted to acquire relevant data to assist in the
<br />design of the project. The Information accumulated will Include as -built drawings, utility information,
<br />and horizontal and vertical control data.
<br />The Project Team will review the project In the field and take photographs of potential problem areas
<br />or items that need special attention. Particular emphasis will typically be given to Identifying areas
<br />where existing Improvements are in a deteriorated condition, pose a significant design constraint or
<br />could be impacted by the widening (utilities, walls, structures, driveways, etc.).
<br />Utf/ltvCoard/notlan
<br />information will be collected from all the utility companies. Coordination with the utilities will continue
<br />throughout the design of the project. A copy of the utility file will be provided to the City. for this
<br />project we have assumed no utility potholing will be required.
<br />ANDERSON VENNA
<br />25E-388
<br />
|