RESU Es
<br />Darren Adrian, P.E.
<br />PROJECT MANAGER
<br />Darren has more than 27 years of professional experience in civil engineering
<br />related to planning, design, and construction of transportation facilities. His primary
<br />emphasis has been in the areas of roadway planning and final design associated
<br />With highways and strosts Including Interchanges, at1rade tntersections, railway grade separations,
<br />widening and rohahnitatlon;'He has served as project managerfor the City of Santa.Ana On -Call for
<br />several years.and brings a superior project management track record combined with technical knowledge
<br />and skill, He recently served as ASCE President for the Orange County Branch, which demonstrates both
<br />his dedioation to the engineering community as wall as the respect he has garnered ornongst,his peers.
<br />Professional Credentials
<br />Bachelor of.Soienco, Civil Engineering, California State Polytechnic University, Pomona
<br />Professional Engineer In California (053031) and Utah (0318105-2202)
<br />American Public Works Association, Member
<br />American Society of Civil Engineers (ASCE), Board Member
<br />Institute of Transportation Engineers, Member
<br />Relevant Experience
<br />• County of prango, On -Call Archftect/Engineer
<br />Design Support Services (414.17), Orange
<br />County, CA – Project Menager.
<br />• City of Corona On -Call Traffic and Transportation
<br />Services, Corona, OA — Project Engineer
<br />A City of Fontana On -Call Pavement
<br />Rehabllltation/Utility Design, Fontana, CA,
<br />Project Manager
<br />al Can -Call Civil Engineering Professional Services,
<br />San Bernardino County, CA -- Project Engineer
<br />J On -Call Traffic and Civil Engineering Services,
<br />(Industry), City of Industry, CA -- Project Manager
<br />A OCTA, Preliminary Engineering and
<br />Environmental Documentation for 17th Street
<br />Grade Separation Project, Orange County, CA --
<br />Project Manager
<br />ACE Construction Authority, Phase 11 Grade
<br />Separations PS&E, Fullerton Road Grade
<br />Separation, City of Industry, CA — Project
<br />Manager
<br />A Anaheim Rapid Connection (ARC) Streetcar,
<br />Anaheim, CA -- Project Manager
<br />i Azusa Avenue/Amar Road Intersection
<br />Improvements, West Covina, CA --Project
<br />Engineer
<br />Azusa/Cale intersection Analysis, City of Industry,
<br />CA-- Project Manager
<br />• Baseline (Road/Laurel Avenue Intersection
<br />Widening,Fontana, CA-- Project Manager
<br />/ City of Anaheim, Cane Autry Way
<br />improvements (1-5 to State College Blvd.) &
<br />State College Blvd. Improvements (West Side),
<br />Anaheim, CA--- Principal-ih-Charge
<br />J California State University -Long reach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA-- Project Manager
<br />City of Buena Park, SR 01/Beach Blvd WB Exit
<br />Ramp, Buena Park, CA — Project Manager
<br />A CSU Long Beach, East Campus Road - Safety
<br />improvements, Long Beach, CA — QC/QA
<br />Reviewer
<br />A Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA--
<br />Projeot.Manager
<br />,d East Coast Highway Slgnal Rehab Design,
<br />Newport Beach, CA— Project Dlrector
<br />• Firestone Boulevard Improvements, Buena
<br />Park, CA— Project Manager
<br />/ Pavement Rehabilitation (Task Order Under On -
<br />Call), Pomona, CA -- Project Manager
<br />1 Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1-5 to Beach Boulevard, Buena
<br />Park, CA — Project Manager
<br />25E-40
<br />Kimlepftrn
<br />
|