Ted Riddell, PG, CEG Geotechnical Engineering
<br />Education: BA/1985/Geologic Science, University of California, Santa Barbara
<br />Registrations: 1987/PG/CA #5657,1990/CEG/CA #1775
<br />Ted Riddell, PG, CEG, has more than 30 years of experience in all phases of geotechnical projects. Ted
<br />has managed or worked on projects for private and public sectors including planning, geologic mapping,
<br />coordinating, conducting and writing of preliminary investigations, supervision, direction of field
<br />personnel and site inspections during grading to final drafting and report writing of completed projects.
<br />RELEVANT EXPERIENCE
<br />Beach Blvd/Whittier Blvd intersection Improvement Project, City of to Habra, CA. Geotechnical project
<br />manager for the pavement recommendations and percolation tests, Including obtaining permits from
<br />Caltrans to conduct the testing and sampling.
<br />Firestone Boulevard Improvements, City of Downey, CA. Geotechnical project manager for the
<br />pavement and utility recommendations, Including pavement recycling alternatives.
<br />Broadway Improvements, City of Laguna Beach, CA. Geotechnical project manager for grading,
<br />pavement and utility recommendations, including obtaining permits from the County of Orange to
<br />conduct the testing and sampling.
<br />Imperial Highway Improvements, City of Anaheim, CA. Geotechnical project manager for the pavement
<br />and retaining wall recommendations.
<br />Pavement Rehabilitation/Reconstruction of Beverly Manor Drive, City of Seal Beach, Orange County,
<br />CA. Responsible for existing pavement evaluation and recommendations for Full Depth Reclamation
<br />(FDR), coordinate AC coring and soil borings, analyze laboratory data, preparation of report including
<br />evaluation of subgrade soils, pavement overlays and new pavement sections.
<br />City of Garden Gove, Orange County, CA. Project manager/engineering geologist for Tw€ntree/Choss€er/
<br />Greentree Storm Drain and Sewer Improvement Project, coordinate drilling of soli borings, analyze
<br />laboratory data, preparation of report including shoring recommendations, evaluation of subgrade soils,
<br />and new pavement sections. Subsequently managed the observation and testing during the construction
<br />of the storm drain, sewer and pavement improvements.
<br />Castalc Lake Water Agency, Los Angeles County, CA. Project manager/engineering geologist for
<br />geotechnical Investigation addressing the geotechnical conditions at the site relative to the planning and
<br />design phase of the Castalc Conduit Bypass Pipeline project. Coordinated drilling program within major
<br />thoroughfares and pipe jacking across San Francisquito Wash, completed detailed Geotechnical Report
<br />for several alignment options, including shoring options, Jack and bore recommendations and general
<br />earthwork guidelines and specifications.
<br />La Habra, Orange County, CA. As project geologist, performed a geotechnical investigation for a 400+
<br />acre master planned residential/golf community on a former oilfield, followed by management of the
<br />operations of the geotechnical personnel during the rough grading of the project. Duties during grading
<br />Included field geologic mapping, large ancient landslide complex removals and stabilization, slope
<br />stability analyses, in -grading recommendations for remedial grading, and preparation of geotechnical
<br />reports and geologic maps,
<br />Rancho Mission Viejo, Orange County, CA. As project geologist, performed a geotechnical Investigation
<br />for a sand and gravel mining operation. The Investigation was done to determine the extent of the
<br />remaining minable material as well as a geotechnical review of the potential reclamation plan. Utilized
<br />field geologic mapping, subsurface analyses and seismic refraction surveys In preparing the analyses.