My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A Prevailing Wage Rates are subject to Increases pursuant to the State of California's Department of Industrial <br />Relations Wage Rate Determinations. APP's Billing pates will increase In proportion to the OIR Increase. <br />Other Direct Costs: Reimbursement of identifiable non -salary costs that are directly attributable to the project such <br />as oversized and/or color reproduction costs, site facility hard phone line and/or. Internet service charges, <br />and/or other travel expanses to romote fabrication yards / batch plants, overnight postage/couriers, <br />etc., are billed at actual cost plus five percent (5%) to cover overhead and administration. Travel charges to a <br />castingtfabrication yard/batch plant will Include the hourly billing rate plus travel expenses as listed in the Caltrans <br />Travel Guide (State rates). Non -commuting mileage required for travel on the project and to and from locations <br />other than the project site are billed at the allowable IRS mileage reimbursement rate (currently $0.435 per mile). <br />Fees for subconsultant services: Billed at actual cost plus 10 percent (10%) to cover overhead and administration. <br />Payment Terms: A late payment finance charge at a rate of 12 percent (1251) per annum will be applied to. any unpaid <br />balance commencing 30 days after the date of original invoice, <br />Escalation: This rate schedule Is of fecdve through June 30, 2019. Should the Contract duration be extended beyond <br />June 30, 2019, rates will be subject to annual and/or periodic revisions as necessary to accommodate Inflationary <br />trends, salary adjustments and the general cost of doing business, as mutually agreeable to the parties and <br />approved via Contract amendment prior to implementing higher rates. in the event the contract is subject to <br />delays that are beyond APP's control, a request will be made to increase the billing rates to APP's current standard <br />rates, and the Client will use all reasonable effort to allow such billing rate Increase, <br />Exclusions to Scope and Pam The following Items are specifically excluded: <br />•legal advice <br />Specialized Software (other than MS Office Suite and MS Project) <br />• Building Codeanspection <br />•Surveying <br />• Design services and responsibilities <br />• Materials, soils and/or hazardous materials testing or monitoring <br />• Construction tabor, Materials and/or Equipment <br />• Copies of plan and specifications or other oversized drawings <br />Work hours/level of effort over and above those Initially approved for the scope of Work / Project assigned <br />or for delays to the contract time beyond the scope and control of APP. <br />• Construction management and/or labor compliance services unless otherwise specifically called form the <br />Scope of Work, or specifically added by City <br />Additional services not specifically called for In the proposal <br />Expert witness services <br />• Standby services <br />25E-426 <br />
The URL can be used to link to this page
Your browser does not support the video tag.