Eric Regueiro, P.E., ENV SP
<br />CIVIL AND TRANSPORTATION ENGINEERING –
<br />TASK MANAGER
<br />® Eric has more than a dozen years of experience in civil engineering for roadway and
<br />lend development projects throughouf.Southorn California. Histochnloal skillsot
<br />.allows hint :to support a wide range of pro1ects, from.local roadway Improvements to major interchange,
<br />grade separation, and regional transportation projects, His emphasis has been on street improvemsht
<br />design, pavement condition analysis,. grading and drainage, stormwator management, and sewer and
<br />water system design. tosdditlon, Eric uses both of the major design software programs - AutoCAD Civil
<br />3D and MloroStatioh/InRosds,, and is able to design and model roadway plans using the client°s preferred
<br />CAD software,
<br />Professional Credentlals
<br />Baoheiorof Science, Civil Engineering, University of California, Irvine
<br />Professional Engineerin California (ff78181)
<br />Envision Sustain Professional
<br />American. Society of Civil Engineers, Associate Member
<br />Relevant Experience
<br />i Long Beach Oltywide Pavement Maintenance
<br />Management System, Long Beach, CA
<br />Project Engineer
<br />A City of Anaheim, pane Autry Way
<br />Improvements (1,,5. to State College Blvd.) &
<br />State College Blvd. improvements (West Side),
<br />Anaheim, GA — Project Manager
<br />• Alameda Corridor East Construction Authority,
<br />Phase 11 Grade Separations PS#E, Fullerton
<br />Road Grade Separation, City of Industry, CA—
<br />Project Engineer
<br />• Artesia Boulevard improvements, Buena Park,
<br />CA-- Project Engineer
<br />A Baseline Road/Laurol Avenue Intersection
<br />Widening, Fontana, CA --Analyst
<br />• City of Buena Park, Auto Center Drive Traffic
<br />Signal and Median Design, Buena Park, CA --
<br />Project Engineer
<br />• City of Fontana On -Call pavement
<br />Rehabilitation/Ul1Hty Design, Fontana, CA—
<br />Project Engineer
<br />• CSU Long Beach, East Campus Road - Safety
<br />Improvements, Long Beach, CA — Project
<br />Manager
<br />I Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA T -
<br />Analyst
<br />Kidey»)Horn
<br />A Expo Metro Eine Construction Authority, Design
<br />of LRT' Phase 2, Los Angeles, CA— Project
<br />Engineer
<br />• Firestone Boulevard Improvements, Buena
<br />Park, CA --Analyst
<br />• Fresno Marketplace at El Paseo, Fresno, CA—
<br />Project Engineer
<br />♦ La Habra Horbor/Lambort intorseotion
<br />Widening, La Habra, CA—Project Engineer
<br />• Lakewood. Boulevard and Cover Street
<br />Intersection Improvements, Long Beach, CA —
<br />Project Engineer
<br />1 New Pedestrian Mall and Repairs to North
<br />Deukmejian Way, Long Beach, CA -- Project
<br />Engineer
<br />• Ocean Park Boulevard Complete Green Street
<br />Project, Santa Monica, OA- Project Engineer
<br />i Orange County Transportation Authority,
<br />Preliminary Engineering and Environmental
<br />Documentation for 17th Street Grade Separation
<br />Project, Orange County, CA -- Project Engineer
<br />,4 ROM, IA0 Bypass, Riverside County, CA—
<br />Project Engineer
<br />A ROM, Mission Boulevard Bridge Replacement,
<br />sub to Kleinfelder, Riverside, CA -- Project
<br />Engineer
<br />25E-45
<br />V
<br />(4
<br />. M
<br />r:.
<br />
|