My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
addition, the plans will include the sidewalk, and parkway <br />improvements. The bike lane, signing and striping plans <br />will be prepared at a 1" - 40' scale. These designs will <br />be supplemented by our field review of the project area <br />to visually confirm and assess the projact condition and <br />Identify specific improvements to be included In the <br />project. These plans will then be used to evaluate the cost <br />of the project, and ascertain the impact on the adjacent <br />property owners other private improvements. <br />G. MEETINGS/SCHEDULES <br />We will be available to attend team meetings, City Council <br />meetings and any other meetings with staff, agencies, and <br />the public as required. Utilizing Microsoft Software Project, <br />we will maintain updated project design schedules for use <br />by the City staff. <br />Final Design: flans, Specifications <br />and Estinintes <br />This task involves the completion of construction <br />documents in the form of final PS&E. <br />A, FINAL IMPROVEMENT PLANS <br />Upon City approval of the preliminary design, we will <br />proceed with the preparation of final design plans, <br />specifications and cost estimate for submittal to the City <br />at the preliminary and final completion levels process. All <br />plans, reports, and documents will be submitted in the <br />format acceptable to the City, <br />The Pians will be prepared to conform to the general <br />requirements of the City with consideration for the needs <br />of the contractor's construction operations. We will <br />deliver completed and approved construction drawings <br />on or ahead of approved schedules. All designs shall <br />be prepared and submitted in a manner that ensures a <br />complete design approved by the City. Where applicable, <br />the construction drawings will conform to the appropriate <br />applicable standards such as City, county, state standard <br />plans and specifications, APWA Standard Specifications for <br />Public Works Construction "Groenbook;' and Manual of <br />Traffic Uniform Control Devices, <br />The following drawings will be prepared for the project and <br />will be part of the plan set; <br />• Title Sheet <br />• Detail Sheet <br />• Street Widening and Rehabilitation Plans & Profiles <br />• Sidewalk and Parkway Improvement Plans <br />• Bike Lane, Signing and Striping Plans <br />2 0•2 General Notes, Construction Notes, <br />Legend <br />1,..3xxtsrx`.sttt'I9&ipP Ala W <br />No <br />5.6 SP -5 & Bike Lane, Signing, Striping <br />SP -6 & Markings Plans <br />B. SPECIFICATIONS <br />We will prepare complete project specifications, including <br />special provisions that specifies traffic control, construction <br />notification and posting information per City's fonnat and <br />direction. Copies of the Standard General Provisions and <br />Construction Contract Agreement shall be supplied by the <br />City to incorporate into the Construction documents. <br />C. QUANTITY AND COST ESTIMATES <br />We will provide complete construction quantity and cost <br />estimates for the project. Estimates will be provided <br />at preliminary and final completion submittals, and a <br />final estimate with the final submittal. Excel files will be <br />submitted with each submittal. Quantities will match the <br />Bid Proposal final quantities. <br />Bidding and Constructiorn Services <br />We will provide support services during construction. <br />Once the plans are approved and advertised, we will assist <br />City staff with bid/award activities, including responding <br />to bidder questions, We will be available to attend pre-bid <br />meetings and other meetings with staff as required, We <br />will also be available to clarify design -related issues at all <br />times. <br />B. CONSTRUCTION SERVICES <br />We will be available to attend pre•construction meetings <br />and other meetings with staff, agencies, and the public <br />as required. We will Provide responses to Requests for <br />Information. We will attend any required site meetings and <br />we will Incorporate all redline comments prepared by the <br />Contractor and project inspector and provide thews -built <br />plans, <br />25E-455 <br />
The URL can be used to link to this page
Your browser does not support the video tag.