|
CONTWI. N
<br />KEVIN WHOM, Jr., PLS
<br />Surveying Rr9jac_t Manager'
<br />.
<br />..................................................._......1.... . ... .......... . ....... ................. . I ........ .......... 14-....
<br />Mr, McHugh is a Itoonsed landOtsurveyor With nnore-than 35yosmataxpedonoe. mviff
<br />35 Years
<br />manages NVWs surveying operations 16 our Southern California Region. As asrvey me Slier,
<br />n
<br />he supervises all surveying and Mapping operations. This role Includes oversight of field
<br />.
<br />surveys, construction WWII, field OrOW supervision, field and aerial topographic surveys,
<br />-AA:Mathoraattcs
<br />the:preparation and quality CGITW Of final MOPS, ADQDrd of surveys, legal desodpt Wns,
<br />right Of Way maps, appraisal DISP94, boundary surveys and analysis, ALTA Surveys, ,.lot Iflye
<br />ONAYdr,
<br />adjustments, constraint MOPS, condominium plans,-and vomer records.
<br />- 40
<br />Project Experience
<br />........ . ...... . ............... . ........,;.,..,.,,,..:,,,.,w...
<br />SR-261 and SR-241 ^ Eastern Transportation Corridor I Caltrans
<br />provided. all boundary ana1Ya1s,9ftd.rfght4Avay, CADD project opordinabon for
<br />�0114�JrSnSAVWIOA 00rddGf project In Orange County, HIS
<br />this 2,G los
<br />Indk0ed aupervlslohand approval and preparation of Mara than 5G0 1601
<br />deWloons and exhibits for righ"f-way Wultiffon. He Supervised preparation of off
<br />appraisal maps, dghW-waym,00%, records of.sut%(M,.surveY-contr.oI maps, horizontal-
<br />control calculations, and CADD4110 management. Kevin served as the Project manager
<br />for right of wayfdr this challenging project which covered the fullsotirumbfiright;
<br />pe
<br />of Way 610PO!" and engineering alemerits. Under his dlractlolp,ihe, right or way/
<br />Mapping team evaluated -title report, restrictions and prepared pmJeot Constraint
<br />Maps; developed PropertySinclarsoctitalpingall thf6rMationand legal data used to
<br />for appraisals and Subsequent parcel eaquisitl6hig prepared legal d iptlon. and
<br />Wr a
<br />exhibits for var[ous-typets of property rights acquisition Including fee acquisitions,
<br />slope, dfainage, road"
<br />and Joint Use Agreements and -Consent to Common Use Agreements for More, than
<br />eC utllltyfsollltles.
<br />1-5/1-405 and Bake Parkway interchange. I Caltrans
<br />As land surveyor-In-charge for this project, KWn'sdutles covered densiffoation of
<br />rV �
<br />horizontal and vertical control, design au surveys, aerial mapping, right way base
<br />mapplhgand survey control maps for three miles of design cross sections, His work o on
<br />the prefect included preparation of legal description and plats for right 0-Waytakes,
<br />and preparation of appraisal maps and right-of woy maps,
<br />Foothill Transportation Corridor - Oso Segment I Caltrans
<br />Provided all boundary analysis and right of way CADO project.coordinetion for the
<br />five mile 809MOnt: of the Foothill Transportation Corridor project. Responsibilities
<br />Included supervision and approval of Preparation of more than 35 legal desdrfpuon§
<br />and exhibits for right .of way acquisition as well as supervision of preparation of all
<br />appraisal Maps, right of way maps, records of Surveys, survey control maps, horizontal
<br />control calculations, and CADD file management.
<br />Newhope Street Expprislon I Caltrans
<br />Surveyor In charge responsible for completing the boundary survey and analysis to
<br />determine the existing street right of Way, Caltrans right of way, and private ownership
<br />boundaries, as well as the preparation and oversight of all legal descriptlons and
<br />exhibits required for the City of Fountain Valley to acquire the additional neoessary
<br />right of way for the project,
<br />25E-474
<br />
|