Laserfiche WebLink
COMTACT INFii <br />tom.aounsOrw5 ora <br />949.585.0477 <br />EXPERIENCE <br />I 35year$ <br />EDUCATION <br />BA; easiness <br />Admirii'stcetion <br />AssoollstasArta Degree <br />LICENSES <br />American Institute of <br />Csrtitisd Planners Llo: <br />011829 <br />Hazardous Materials <br />&.Site,Asasssment <br />CartiftWiton, University <br />of Califvrrils'.San Olego <br />0mnsion.:1996 - <br />Certified Environmental <br />Surveyor SDG&E -1994: <br />TOM ACUNA, AiCP <br />kovltonmental Managef <br />.n....o...o w.,.»«....„.....................n««........... .....,�. vyy w .,............ ......o «....«..«u..,............... n <br />Mr Mans currontlydirsots theof ens of W5.1# EnVlionmental Gawp, performing all <br />aspeata.of environmental support. He has ntdra`tbdn 95 years of mperfance obtaining <br />teal, state and federal appreVels foreleotdc dndgaa proJecfs. Dutfeslaclude sugervlsing <br />Permitting. He <br />anddeaertregicna. <br />operations <br />171 <br />Project Exporlon e <br />......... .... .W ................. ....._.... ., ... <br />Es*dhdido Expedited et?ttety SO MW/1. 0I lWH and Ei Cajon I S..I313&E <br />Tom was roepcnslgle for ensuring environmental and safety compilance fer tiro largo <br />lithium !on This technology Is relatively now tooInvestor utilities <br />arid. requirt.doamprehenaive review of manufacture sPeciW(Allone,arid operational <br />i gd1r8m6WtoMInimize.Sbta&E risk <br />ECC Substation PTC. Application I SDG&E <br />Prepared the Eco Substation Proponent Environmental Assessment oversaw <br />the ,Joint t OR/Els. This decurjdrit described and evaluated proposed fiopro.voments <br />consisting of a new 100-aore substdtfon/switchyard, expansion to an SdAting <br />substotioh, and' construction of a 1.3-mlla transmission line to connect them. The PTC <br />granted the.application'in June 2012. <br />Mountain Empire Major Use Permit I County of Stan Diego <br />Tom worked with this team obtain Major Use Permit from the County of Diego <br />to allow a heavy equipment training facility. Key CEQA issues were visual and noise <br />Impacts. At this direction, Tom conduotsd a CEQA, Initial study and employed msasdrss <br />so that the projeot.qualifiedfora Mitigated Negative Declaration. Project completed in <br />2011, <br />Hazardous Material Assessment I City of Coachella <br />Tom developed and provided a hazardous material assessment (Phase 1) related to <br />the removal of water tine 48 from a street position and private property. The Phase <br />identI ted historical Obalamination and Its relationship to hazardous material related to <br />the water line. Completed June 2017, <br />San Diego Natural Gas Pipeline CFCN Application I SDO&E <br />Supported the project during the routing phase of a new 42 -mile gas line. Provided <br />opportunities and constraint mapping, identified feasible alternatives, Identified <br />regulatory requirements at multiple locations, and oversaw efforts of environmental <br />team in 2015 to prepare a project Proponents Environmental Assessment The CPCN <br />application Is currently under consideration at CPUG). <br />25E-476 <br />