Laserfiche WebLink
' P[ofdssional aeglstranou's; <br />Call6wrila Professional Geologist <br />(No. 9W) <br />Certified California Hydrogeologist,. <br />(No. 9038) <br />QEOSCI`ENCE TERRY A.WATRI.N%JR. PG, CHG <br />'Senior Goohydrologjst <br />Mr..ylatkins has over fourteen yearsof experience in many different types of <br />projects; tnpltlding geohydrolitgic investlgations, groundwater quality irtydies; <br />artificial recharge projods, water well test drilling programs; sea water <br />desalination programs, and the management and supervision of water well <br />Projects igejudjng: siting, design, srjuifer pumping tort analyses and well <br />construction. Ostlad bolaW arevarious 69hrOpiss of Me. Watkins° experience: <br />City.of South Pasadena— RehabiRkatton of'Wilson Wellfi2. 2016 <br />Developed rehabilitation rotor'itoehdatl9m;and Work plan for contractor <br />activities. Served as project and construction rminager during rehabilitation, <br />redevelopment, and testing of the well.. This wwork stlecessfuUytlddfalait. <br />production capability of this well. <br />City of Huntington Beach — Replacement of Weft No. A <br />201:4 to Present <br />Prepared p'relifillnary design documents and drawings as well astechnicai <br />plans and:specificattons for the drilling, construction, development,' and <br />testing of the City of Huntington Beach Replacement Well No. 1. Will provide <br />construction management services,lnciuding welidesign recommendations, <br />during construction activities which should begin second quarter of 2017. <br />West Valioy Water District—Rialto Colton Monitoring Well No. 1. <br />2615 to 3016 <br />Project manager for the drilling, design; construction, and development of a <br />910 it stainless steel mon4oring well to serve as a sentinel well monitoring <br />perchlorate migration. <br />Pico Water District. 2016 to Present <br />Project manager overseeing all aspects of this project. Tasks completed to <br />date Include well siting assessment and recommendation, drafting of technical <br />plans and specifications, contractor bid assistance, and permitting with <br />regulatory agencies. Construction and testing are scheduled to begin in <br />March, 2017 <br />� t <br />t o-. <br />25E-483 <br />