Laserfiche WebLink
PROJECT UNDERSTANDING <br />WATER RESOURCES (OPTION A) <br />we underatand'that the CIVIt seeking the design and <br />construction support services for the Santa Ann Water <br />Prejaot This project Includes the rehabilitation of an <br />existing water well approximately So years old, and the <br />design of 150"eet'of 12•ifnoh PVC water main and the <br />construction.of 600 -feet of 15 -inch sewer main on an <br />arterial street, The City would like for the consultant to <br />provide feedback regarding the material of choioa for the <br />sewer main improvements. Also, the City would like to <br />connect this well to the water system, as of right now it <br />does connect to an existing onsite reservoir. This well Is <br />a sand produoer, and currently the capacity has dropped <br />by approximately 35% of its maximum yield of 2000 GPM. <br />The depth of the well 10 approximately 1100fiee4 it has <br />a vertical turbine pump with a 25Ohp motor, In addition, <br />the screens are made of mild steel. No video or any other <br />preventive maintenance has been done in the past 0 <br />years, <br />Well Rehabilitation <br />Our proposed scope of work is divided Into a twaphaae <br />approach. Phase I will Include reconnaissance of the <br />well to characterize the current Wilditidh and develop <br />a rehabilitation plan. Phase Ii will be to parform the <br />rehabilitation necessary to restore the well to proper <br />working order. <br />Since the rehabilitated well is to be connected to <br />the distribution,system, NV5's design will Include <br />considerations for the following required appurtshances: <br />• Flow control valve <br />• Pump to. waste system <br />• Chlodnatlon <br />• SCADAeonnection <br />It is assumed that the well will be to -equipped with it <br />new pump, motor, MCC,'and appurtenances, <br />Water and Sewer Mains <br />Both the water main and sower extensions will be <br />designed according to Citystandards. NV5 would typically <br />specify high-strength VCP for the proposed 16 -Inch sewer. <br />PROJECT UNDERSTANDING <br />GENERAL ENGINEERING (OPTION B) <br />We understand that the City is seeking the design and <br />construction support services for the Mile One Street <br />Project. This project will follow a complete street concept. <br />The length of the project is approximately 1,000 linear <br />feet. Both Intersections at the outer limits of the project <br />have been modified as part of the complete street project <br />under previous phase. The proposed project consists of <br />street rehabilitation, .bicycle lane, sidewalk, and parkway <br />Improvements. The sidewalks are 6 fast wide. and 'tha <br />parkways are 4 feet wide. Tha,projoet also includes <br />widening of the east side of the street to accommodate <br />a now tricycle lane, The right of way is approximately 12 <br />ieet.wlds with three traffic lanes in each,direotion with a <br />14 foot wida median, The required right of way hes been <br />aovlred by the City. <br />GENERAL APPROACH <br />Work Breakdown Structure <br />Upon issuance of a notice to proceed, our project manager <br />will meet with team members to review the requirements, <br />prepare a Work Breakdown Structure and make team <br />assignments for maximum efficiency of resources. The <br />detailed WBS will describe all of the work tasks necessary <br />to complete the project. A mastet project schedule will <br />be prepared following the WBS to show the relationship <br />between tasks, the expected start date and duration <br />for each item. This schedule will serve as a guide to <br />conducting and monitoring the progress of the work and <br />to ensure projects are completed on time and within <br />budget. To ensure accurate monitoring and tracking of <br />documents, revisions and progress, a document' tracking <br />and control system will be developed. We will meet <br />with City project representatives regularly and maintain <br />constant communication to ensure successful and timely <br />delivery of the project. Meeting minutes will be distributed <br />within one week of the meeting Identifying actions, Items, <br />assignments and due dates, <br />Cost Contras <br />We are able to continually review and evaluate a project's <br />cost through all project phases to enable Informed and <br />25E-503 <br />