|
I
<br />I
<br />I
<br />I
<br />GONNA IWO
<br />KEVIN McHUGH, Jr., PL.S
<br />kavin:inchugh�irv5 com
<br />SurveYlu Project Manager
<br />r90.586-0477
<br />... , ,.M ..........................,.........
<br />kxRERIRdCE
<br />.w.,_... _......... ....w._,... , ..._......
<br />Mr, McHugh is a licensed land surveyor with more than 35 years of experience. Kevin
<br />38years
<br />manages Nve'ssurveymg operations In our southern California Region. As survey manager,
<br />EPUCATiON
<br />hs supervisoa ail surveying end mapping Operations. This role Includes oversight of told
<br />AA Mathamoos
<br />surveys, constnrotion staking field orewsupervision, field and serial "topographic survsys,
<br />the preparation and quality control offinal maps, record of surveys, legal descriptions,
<br />LICENSES
<br />right of way maps, appraisal maps, boundary surveys end analysis, ALTA surveys, lot One
<br />PT66sfonalland Surveyor
<br />adjustments, constraint maps, condominium plans, and corner records.
<br />(JA 463,
<br />Project Exilharience
<br />......._._..m.....,....._.._. » ...._.....__. .... ... w
<br />SR -261 and SR -241 - Eastern Transportation Corridor j Caltrans
<br />Kevin providefl ail boundary analysis and ryghWway CADD projaot coordination for
<br />this 24 -mile tran'sportatidn corridor project in Orange County, His responsibilities
<br />included superclsion and approval and preparation of More than 500 legal
<br />descriptions and exhibitsfor right of-wayatquiettlon. He supervised preparation of all
<br />Appraisal maps, rightofwaymaps, haoords of surveys, survey control maps, horizontal -
<br />control calculations, and CADD•file management I Wn served as the project manager
<br />for right.of way for this chailengirorciieot, which cowered the full spectrum of right-
<br />of -way mapping and ar ineering elements, Under his direction the right of wayl
<br />mapping foam evaluated title report restrictions and prepared project Constraint
<br />Maps; developed Property Binders containing all information and legal data used to
<br />for appraisals and:subsequent parnalaNulsifons; prepared legal descriptions and
<br />exhibits for various types of property rights acquisition including fee acquisitions,
<br />slope', drainage, roadway'end utility easements, temporary construct(on easements,
<br />and Joint Use Agreements and Consent to Common Use Agreements for more then
<br />604I11y facilfties.
<br />1-5/1-405 and Bake Parkway Interchange I Caltrans
<br />As land surveyor -In -charge for this project, KaWn's duties covered denshication of
<br />horizontal and vertical control, deslgri surveys, aerial mapping, right -of --way base
<br />mapping and survey control maps for three miles of design or oss sections. His work on
<br />the project included preparation of legal description and plate for rightof-way takes,
<br />and preparation of appraisal maps and dot-of=waymaps.
<br />Foothill Transportation Corridor- Cso Segment I Caltrans
<br />Provided all boundary analysis and right of way CADD project coordination for the
<br />five mile segment of the Foothill Transportation Corridor project Responsibilities
<br />included supervision and approval of preparation of more then 35 legal desccriptions
<br />and exhibits for right of way acquisition as well as supervision of preparation of all
<br />appraisal maps, right of way maps, records of surveys, survey control maps, horizontal
<br />oohtrol calculations, and CARD file management
<br />Newhops Street Expansion i Caltrans
<br />Surveyor in charge responsible forcompletingthe boundary survey and analysis to
<br />determine the existing street right of way, Caltrans right of way, and prlvate ownership
<br />boundaries, as well ae the preparation and oversight of all legal descriptions and
<br />exhibits required for the City of Fountain vallayto acquire the additional necessary
<br />N V 5 right of wav for the orolect.
<br />25E-536
<br />
|