Laserfiche WebLink
CONTACTINFO <br />TOM ACUNAr AICD <br />tom.a477ou 477B.rom <br />549.6 85.,00 <br />Environmental Manager <br />....... ... ... ................. <br />EXPERIENCE <br />,.....,............................ w 111.1. .........,,._........,.. <br />Mr. Aouna currently directs the of asof NV51~ Environmental Group, performing all <br />36 years <br />aspacfs or environmental support, He has mote than 36 yoars pf experience obtaining <br />EDUCATION <br />local, state, and federal approvals for electric and.gas projects. Duties Include supervising <br />6A, susmess <br />eight Field Environmental Specialists'spectalizing In biological and environmental <br />AdminIstratlon <br />permitting. Newssresponalblefor paorlhgtagulstorystrategies tcobtain permits, <br />reviewing and editing technical rapor%preparing environmental releases, coordination of <br />Associates AM Degree <br />construction monitoring, tracking and psslghingprojects, and program administrationof <br />LICENSE"+ <br />state and federal Permits, clearing the way for SCG.operationsinCalfiernias Central valley <br />American institute of <br />and desert regions. <br />Corti" d Planners LIM. <br />016825 <br />project EXperlence <br />Hazardous Materials <br />.... -.1 .... .... .... ...... ............ ,.,...... ...... ............ .,.. . <br />& Site Assessment <br />University <br />DortifiofCalo <br />Escondido Expedited Battery 30 MViI/12OMWH ane! El Cajon I SDO&E <br />ruin o <br />of Callfomfa son 01®gu <br />Tomwasresponsibleforensuringenvironmentalandsafetycompllancafortwolarge <br />Extension -1956 <br />lithium ion. bettery storage"systems: This technology is relatively new to imtdstor utEpties <br />and required comprehensive review of manufacture specifications and operational <br />Certified Environmental <br />requfremonts to minimize.SpG&E:risk, <br />surveyor SPUE -'1994 <br />ECO Substation PTC Application I SDG&E <br />Prepared the Eco Substation Proponent Environmental Assessment and oversaw <br />the Joint EiR/EIS. This 00eument described and "evaluated proposed ilnprovernarrie <br />consisting of a now 100 -acrd substation/switchyard, expansion to an existing <br />substation, and construction of 13 -mile transmission line to connect them. The PTC <br />granted the application in lune 2012, <br />Mountain Empire Major Use Permit i County of San Dieigo <br />Tom worked with this team obtain Major Use Permit from the County of San Diego <br />to sallow a heavy equipment training facility, Key CEQA Issues were visual and noise <br />impacts. At this direction, Tom conducted a CEQA,inittal study and employed measures <br />so that the project qualified for a Mitigated Negative Docfaratiom Project completed in <br />2411. <br />Hazardous Material Assessment I City of Coachella <br />Toro developed and provided a hazardous material assessment (Phase 1) related to <br />the removal of water line 48 from a street position and private property, The phase I <br />Identified historical contamination and Its relationship to hazardous material related to <br />the water line. Completed June 20.17, <br />San. Diego Natural Gas Pipeline CFCN Application I SUG&E <br />Supported the project during the routing phase of a new 42 -mile gas line. Provided <br />N I V op"portunhias and constraint mapping, IderntlNed feaslbla alternatives, identified <br />regulatory requirements at multiple looetions, and oversaw efforts of environmental <br />team in 2015 to prepare a project Proponents Environmental Assassment: The COON <br />application Is currently under consideration at CPUC). <br />25E-538 <br />