Laserfiche WebLink
t <br />r'CIENCE h <br />Mr. Watkins has over fourteen years of experience In many different types of <br />Projects, including geohydrologic investigations, groundwater quality studies, <br />artificial recharge Projects, water wail test drilling programs, sea water <br />desalination programs, and the management and supervision of water well <br />projects including: siting, ,resign, aquifer pumping test analyses and well <br />construction. Listed bekwv are various examples of Mr. Watkins' experience: <br />i <br />City of South Pasadena —110habilitathtn of Wilson Well 112. 8016 <br />Developed rehabiliEat(on recommendations and work pian for contractor <br />arttvittas. Served a6 pmject and construction manager during rehabilitation,_ <br />` <br />redevelopment, and testing of the well: This work successfully doubled <br />Production capability ofthis wel(. <br />UgsKn; <br />City of Huntington Beach — Replacement of Well No.1 <br />rs <br />Management <br />2414 to Present <br />rPrepared <br />atam <br />0"rgl <br />preliminary design documents and drawings as well as technical <br />�>tyroareeManagemert <br />plans and specifications forthe drilling, construction, development, and <br />�Ma 3Arelny5tu<ues <br />testing of the City of Huntington Beach Replacement Well No. 1. Will provide <br />construdlon management services, Including well design recommendations, <br />x " ' <br />,�Nfc�Hen:. <br />during constructionactivitlerwhich should begin second quarter of 2017. <br />State Polytechnic <br />Valley West Vali Water District- Rialto Calton Monitoring Well No. 1. <br />UoWersity, Pomona, 2003: <br />2015 to 2010 <br />Project manager for the drilling, design, construction, and development of a <br />erotassional aesistratioin; <br />410 ft stainless steel monitoring welt to serve as a sentinel well monitoring_ <br />California Professional Geologlst <br />perchlorate migration. <br />(No. 9046) <br />certified California I' iydrogeologist, Plco Water District. 2016 to Present <br />(No. 1038) Project manager overseeing all aspects of this Project. Tasks completed to <br />date Include well siting assessment and recommendation, drafting of technical <br />plans and specifications, contractor bid assistance, and permitting with <br />regulatory agencies. Construction and testing are scheduled to begin In <br />March, 2017 <br />t <br />Y- <br />.r,\bS tstz'tY.f�i <br />N <br />25E-545 <br />