Laserfiche WebLink
TAIT <br />4 .nix.m rx, sxeu�xai <br />,0141$6018200 www.lalccom <br />701 N. Porkcnnte, D Wft. 5o41* Ana. CA 92905 <br />David Sloan, PE, Director of Engineering for TAIT will serve as on Alternate/Deputy Project Manager for the <br />City's projects, David's career has been rooted exclusively in the public sector. His background and experience <br />with local federally funded public works projects, especially roadway improvements, will be invaluable to the <br />city. <br />Mr. D. Todd Schmieder, PE, QSD/P will act as TAIT's QA/QC Manager for this contract. Todd will also act as the <br />Alternate project Manager should it be deemed necessary based on the project's specific requirements. Todd, <br />who currently serves as the County of Orange pian check manager for TAIT, has 38 years of experience In a <br />variety of.public works projects. He is also a certified QSD/P and is the best candidate to review the design <br />documents for the City to ensure they are to the standards required and free of error prior to submittal to the <br />City. Mr. Schmieder's broad background ranges from planning and design of the Orange County Toll Roads to <br />preparing construction documents to Orange County' new Animal Care Facility In Tustin. <br />In addition to the noted Key Staff, TAIT boasts a wide array. of 150 associates including Engineers, Architects, <br />Surveyors, Storm Water Practitioners, Geologists, Contractor% and quality design engineers. The City can be <br />assured that the necessary: support and availability of staff will be provided on each contract that is assigned to <br />us. For our as -needed sub -consultants, we've teamed with tried and true partners who have worked with TAIT <br />on numerous projects. TJW offers thorough Traffic Engineering services, LAE provides Federal Funding <br />assistance, BTL performs precise Potholing and other subsurface investigations, GMU supplies expert <br />geotechnical services, and AN is our experienced Landscape Architecture consultant. <br />Scope of Work, It is understood that this engineering proposal is for an on-call contract that includes potential <br />design services including street improvements, traffic engineering, storm drain Improvements, sewer, water and <br />wastewater improvements, as well as plan checks of the above-mentioned, and other engineering services <br />associated with.municipal public works. TAIT s noted diverse staffing and background in multifaceted projects <br />are ideally suited for the City s wide range of anticipated needs and projects. Upon issuance of an RFP,. TAIT will <br />actively review the project requirements and will provide a project specific proposal for the City's consideration. <br />Commitment to Service, we aim to act as an extension of the City's staff and place an emphasis on Customer <br />Service which has been and will remain one of TAIT's Corporate Goals °Te Completely Satisfy our Customers". <br />ControctAgreementRyteniM TAIT concurs with all provisions as contained in the Agreement in Attachment 2 <br />of the RFP, <br />Jacob Vandervls is the authorized main point of contact for TAIT's <br />services and can be reached in our Santa Ana office at phone number <br />714.560-8200 ext, 677, email iac2 v@Jait.com, and address 701 Park <br />Center Drive, Santa Ana, CA, where the contract will be managed. We <br />thank you for this opportunity to submit our qualifications and look <br />forward to further discussing with you our capabilities and commitment <br />to working with the City of Santa Ana. <br />Very truly yours, <br />T T & A5S'O/CTAT <br />J ob Vandervis, P.E. <br />ief Operatians Officer and Vice President <br />TAIT . <br />5E-561 <br />TAIVs legal name Is Tait & <br />Associates, Inc., and we are <br />a California Corporation <br />(CO495510)headquartered <br />at 701 Parkcenter Drive in <br />the city of Santa Ana, CA. <br />Page 12 <br />