My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25E - AGMT - ON-CALL ENGINEERING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25E - AGMT - ON-CALL ENGINEERING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:21:24 AM
Creation date
6/14/2018 7:55:56 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25E
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
858
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TACT & Associates, Inc. <br />On -Call Engineering services <br />For this proposal we have focused our response on providing quality Civil Design Services. We can also <br />offer other services, lncludin& water resources engineering surveying, project management, planning, <br />entitlement, right of way engineering, and environmental site investigationsand remediation. our <br />company's diverse expertise Is ekpansive. <br />RECENT R,EUVANT ExP,i$I,ENCE <br />Some of the most recent projectsthat we are under contract for or have recently completed are: <br />✓ Irvine Campus Drive Pavement Rehabliftation, City of Irvine (Roadway Rehab & Reconstruction) <br />✓ Quadrant N Water Line Replacement, City of chino (WaterDistrfbution) <br />✓ Street Overlay, Alley Recant. & Cerritos Widening, City of Stanton (Roadway Rehab & Reconst.) <br />✓ <br />Portola Parkway Resurfacing Project, City of take Forest <br />(Roadway Resurfacing) <br />✓ <br />Pier F=G Sewer Line Improvement, Port of Long Beach <br />(Sewerand Roadway) <br />Newport Heights Alley & Sewer Replacement, City of Newport Reach <br />(Alley & Sewer) <br />✓ <br />"18/14 Major Street Rehabilitation, City of Pomona <br />(Arterial Rehabilitation) <br />✓ <br />Citywfda.Comprehensive Drainage Studies, City of Diamond Bar <br />(H&H & storm Drain) <br />✓ <br />SR 395 Regional Storm Drain Improvements, city of Wctorville <br />(H&H & storm Drain) <br />✓ <br />Reagan & Peterson Park Parking tot Rehabilitation, City of Diamond Bar <br />(Parks & Recreation) <br />✓ <br />Library of the Canyons, OC Pubiic Library <br />(Site Design/FacRittes) <br />✓ <br />OC Sheriff Headquarters Security Upgrades, OCSherff Department <br />(Site Desiga/Facigdies) <br />✓ <br />OCACF Facility Design, Survey, and Construction Shaking, OCAnlmal Care <br />(Site Deslgn/FacRltles) <br />✓ <br />Water Main Replacement Design Build Projects, Glendale Water &.Power <br />(Water Distribution) <br />✓ <br />Water Main Replacement Design Build Projects, Golden State Water District (Water Distributionji <br />✓ <br />Harbor Boulevard Street Reconfiguration, City of Garden Grove <br />(Roadway UtJ11t1&) <br />✓ <br />A Town Street Widening & Sewer Improvements, City of Anaheim <br />(Roadway & Sewer) <br />✓ <br />Tustin Metrolink Facility Redevelopment, OCTA <br />(Transportation Facility) <br />✓ <br />On -Call Plan Checking Services, Orange County Public Works <br />(Plan Checking) <br />✓ <br />Irvine USD Site Topography and Campus Evanston, City of Irvine <br />(Design & Survey) <br />✓ <br />Irvine city Hall osr Replacementt. City of Irvine (Site Design, <br />Survey & Environmental) <br />A key component of TAIT's strength Is based upon our ability W focus on solutions that are not only <br />cost-effective, but are also constructible. We know when to look for feedback from our clients and <br />other approving <br />agencies, especially when budget constraints restrict a project's <br />direction. When <br />multiple solutions or options are available, a request for Input/feedback along with our recommended <br />alternative <br />Is presented to our clients ensure that our client's sometimes limited <br />resources and time is <br />efficiently utilized, <br />COMPANY LOCATION ANA faNTAa <br />We are headquartered In the City of Santa Ana, which is where the majority of our civil and surveying <br />staff Is located, Including all of the staff Identified In this SOO. our main office address and contact <br />information Is <br />Joke Vandervls, PIC/Project Manager <br />Vice President/Coo <br />701 N. Park Center Dr. <br />Santa Ana, CA 92705 <br />p! 714/560/8200 ext. 677 <br />www.taM-0111 <br />J&A1T„y Page 14 <br />E-563 <br />
The URL can be used to link to this page
Your browser does not support the video tag.