Laserfiche WebLink
Dave Luzuriaga, .R.E., QSD/R <br />EROSION CONTROL AND SWPPP - TASK MANAGER <br />Dave has been involved In a multitude of projects over his 26 -year career, His <br />background Includes a wide range of civil angineerfro projects for higher education <br />faeilitles and land development Ixojeots in Southern California. His overall grasp of <br />gahetal civil engineering, the process Involved, and the ever•uomplicated permit approvals. has <br />consistently appealed to clients. <br />Professional Credentials <br />Bachelor of Science,: Civil Engineering, California Polytechnic State University, San Luis Obispo <br />Professlonal Engineer in California (#519734) <br />Qualified SWPPP Developer/PractlNoner (400567) <br />California Board for.Clvil Engineers and LandSurveyors, Board Malabar <br />Relevant Expe lehoe <br />• Bellflower Unified School District, Mayfair High <br />:School STEAM Building, Track and Field Stadium, <br />and Additional Improvements, Lakewood, CA— <br />Project Manager <br />• Lake Elsinore Unified School District, Elsinore High <br />School, Synthetic Baseball Field and Courtyard <br />Redaalgn, Wildomer, CA — Project Manager <br />• Long Beach City College, Master Plan Update for <br />New Sports Complex and kinesiology and Health <br />Education Building, Long Beach, CA--- Project <br />Manager <br />• Orange Unified School District, Orange Nigh <br />School Improvements, Orange, CA—Project <br />Manager <br />• Rio Hondo College, Nursing Village, Transit <br />Cantor, and Library Tower, Whittier, CA— Project <br />Manager <br />• Viewpoint School, A/E Services for Sports Facility <br />and Two Parking Lots, Calabasas, CA Project <br />Manager <br />• Long Beach City College, Due Diligence, Now <br />Sports Complex, and new Kineslology Building, <br />Long peach, CA � -• Project Manager <br />• Rio Hondo College, Nursing Village, Transit <br />Center, and Library Tower Seismic Retrofit, <br />Lakewood, CA — Project Manager <br />Cypress College, Baseball Field, Cypress, CA -- <br />Project Manager <br />,A orange Coast College, Substation, Costa Mesa, <br />CA -•- Project Manager <br />Kim Iay*Horn <br />• Fullerton College, Softball Field, Softball netting <br />Dago ADA Upgrades, Fullerton, CA -- Project <br />Manager <br />• College of the Canyons, $coast Field and <br />Accessibility Upgrades, Santa Clatita,.CA— <br />Project Manager <br />• EI Camino College, Campus Wide utility Mapping, <br />and Water Main Relocation Plan, Torrance, CA -- <br />Project Manager, <br />• Viewpoint School, Preliminary Design of Three <br />Parking Lots, Six Tennis Courts, Sewer Alignment, <br />and Multi -Use Synthetic Sports Field, Calabasas, <br />CA — Project Manager <br />• Meter Del High School, Parking Lot Re -Striping, <br />ADA Upgrades, New Modular Building, and <br />Portables, Santa Ana, CA—Project Manager <br />• Mayfair High School, Interim Classroom Modular <br />Village, Now STEAM Building, Now Track and <br />Field Stadium, Now Synthetic Sports Field, LA. <br />County Culvert Design end Conversion of Open <br />Channel, and Storm Drain Percolation Field, <br />Lakewood, CA --- Project Manager <br />• Elsinore High School, New Synthetic Baseball <br />Field, Courtyard Redesign, Wildomar, CA -- <br />Project Manager <br />• Orange High Sohool, New STEM Building, Design <br />of the Interim Portable Village, Campus Wide Utility <br />Upgrades, and Relocation of a Bus Drop oft, <br />Orange, CA -- Project Manager <br />25E-57 <br />31 <br />rt. <br />t;j>s <br />0 <br />