|
Education
<br />BS Civil Engineering,
<br />California State
<br />Polytechnic University,
<br />Pomona
<br />Year of TAIT Team
<br />Enlistment
<br />2616
<br />Total Experience
<br />9
<br />Certifications
<br />E.I.T.
<br />TAIT&Associates, Inc.
<br />On -Call Engineering Servkes
<br />Christopher Engelbach, E.I.T.
<br />pfiamcrENGINwn
<br />Chris is.an experienced Project Engineer In design, approval, and quality control
<br />of residential and commercial land development as well as public work projects.
<br />He has expertise in preparation of tentative tract maps, street, rough grading,
<br />erosion control, storm drain, sewer and water, and preclse.grading plans;
<br />hydrology and hydraulic calculations utilizing Civil -D and WSPG; WCIMP
<br />employing new low Impact development methods; coordination with clients,
<br />suirconsultants, site managers, contractors, and survey crew. Chris technical
<br />skills include AutoCAD Civil 3D, Water Surface Profile Gradient Software (WSPGJ,
<br />Civil -D, and Microsoft Project.
<br />Orangd County Engineering Plan Check, County of Orange, Project Engineer,
<br />2016
<br />Chris currently provides plan check services for the County of Orange including
<br />review of Tentative Tract Maps, Site Development Plans, and Street.
<br />Improvement Plans. Plans are reviewed for compliance wCth various codes and
<br />regulations Including California Building Code, the Americans with Disabilities
<br />Act, and community speclficdevelopmentstandards.
<br />Newport Heights Alley Replacement, City of Newport Beach, Project Engineer,
<br />2016
<br />Chris Is currently a Project Engineer on this alley rehabilitation project which
<br />Includes design engineering, utility research and sewer replacement. Chris Is
<br />responsible for rehabilitation of the alley -ways as well as the addition of ADA
<br />compliant PCC sidewalks, curb ramps, curb and gutter and other improvements.
<br />Redlands Packing House, City of Redlands, Project Engineer, 2016
<br />Chris is currently a Project Engineer on this 10 acre commercial development in
<br />the City of Redlands which includes design engineering, utility research, and
<br />coordination with consultants and field crew. The project includesstreet
<br />Improvements, and on-site Rough Grading and Stockpile, Utilities, Water
<br />Quality, and Precise Grading. Chris is responsible for Street Improvements
<br />Including relocation and reconstruction of medians; traffic signal relocation,
<br />Identification and replacement of non -ADA complaint curb ramps, and updated
<br />crosswalks and landings designed to enhance urban feel, encourage pedestrian
<br />traffic, and increase safety,
<br />Limonite Sumner Retail Development, City of Eastvale, Project Engineer, 2016
<br />Chris is currently a Project Engineer on this 7 acre commercial development in
<br />the City of Eastvale. The project includes Off-site Street improvements, Rough
<br />Grading, Water Quality, Precise Grading, Utility, and on-site Storm Drain design.
<br />Chris Is responsible for street improvements including relocation and
<br />reconstruction of existing medians and updated signing and striping as well as
<br />TAIT Appendix I Page 12
<br />5E-591
<br />
|