Laserfiche WebLink
Reconstruction of the Los Alamitos hump Station and Retarding Basin, Oounty of Orange, OA <br />Pump station'rechnicatAdvisor, Prepared plans, specifications, and estimates for a new Boo cfsstorm <br />water pump station with natural gas engine.drivea pumps to replace the existing Los Alamitos facility <br />for the County of Orange, Work Included final design for the pump station facility and retarding basin, <br />preparation of a value engineering report, final engineering report, hydrology and hydraulic routing, best <br />management practices for Improving water quality, Inspection and analysis of existing 2,400lineal faot of <br />54 -Inch discharge piping, Phase I and 11 environmental assessments, geotechnical Investigation, CEQA, and <br />permit processing, and coordination withageacles and homeowner associations. The pump station includes <br />fourvert(cal mixed flow pumps with a design capacity of 129 MGD each. Each pump is driven by a lsoo hp <br />dual -fuel engine (natural gas and propane). Engine related components Include a compressed air starting <br />system, primary and secondary Jacket water cooling systexn, natural gas primary fuel system, and propane <br />25E-75 <br />f <br />StavenL+onner,pg <br />y' � <br />is,000 acre-ftperyear, OVer16 miles Of 12-lach W484aah diameter pipe, a 2,65 MG welded steel reservoir, a <br />�f ' <br />flow control.acidrecharget'aeliitywith 40,poogpmcapacity Andtip toa85ps1presauredrnp,.apump statiou. <br />sized fors,000 gpm with pumpslnstalled to provide ls,000 gpm, and four turnout flow control facilltles for <br />delivering the water to member agencies, <br />f <br />Sellflower High Oapaoity Wolf, Olty of'Seiiflower, Bellflower, OA <br />i <br />Project Manager. Prepared Apreliminary design report and provided final engineering design, and consttue- <br />? <br />tion management and Inspectlon ;services for the well drilling and equipping of the city's new bigb-capacity <br />� <br />groundwater well. The well Is designed to produce s,soo gallons per minute of high-qualitygrouadwaterto <br />P <br />replace alarge portion ofthe city's water supplies. Electrical design services Included a. motor control center, <br />' <br />a varlable-fraquency drive for the well pump, Interior and exterlorlighting, an -automatic transfer switchi and <br />an emergency diesel -fueled generator. Control design included preparation of process and Instrumentation <br />diagrams and specification ofcootrol components to provide consistency with control components installed <br />...3 <br />in existing city facilities. Provided engineering support duringtesthnggad start-up ofthewell. <br />J <br />Wella "214nd 2E Wellhead Facilities and Pipeline*, Irvine Ranch Water Dlstriot, ivatln,OA <br />t <br />Task Manager. Task manager responsibleforthe design ofthewellheadfacilities and untreated water pipeline, <br />P <br />Dellverables Indluded plans, specifications and engineers estimates of probable construction costs for each <br />the wellhead facilities and all pipelines. Well 21 and Well 22, with capacities of 3,3oo gpm and 1,60o gpm re- <br />spectively, are submersibleturbine pump/ motor assemblies, Installed within vaults, and one wellisequipped <br />with a bladder -type surge tank. Project Included 7,000 ft. of 24 -Inch steel untreated water pipeline, 13,000 <br />feet of 36 -Inch steel product water pipeline and 1,700 LF of 1o4nch HDPE brine concentrate pipeline. The <br />pipelines required jack -and -bores to cross the OCTA Metrolink train tracks, an Orange County Flood Control <br />District channel, BNSF train tracks, a box culvert, And Peter's Canyon channel, <br />Rehabilitation of Oollege Avenue pump Station, Orange Oounty Sanitation Distriot, Oosta Mesa, OA <br />Engineer. Provided engineering services to Orange County Sanitation District for rehabilitation of College <br />Avenue Sewage Pump Station. Provided engineering and construction support services for the rehabilitation <br />ofthe College Avenue Sewage Pump Station. The design Included replacement ofpumpingegaipmentwlth new <br />dry -pit submersible pumps, structural rehabilitation of the wet, -pit and dry -pit, a new ventilation system, a <br />uewodor control system, anew discharge valve vault for intercoxixiectiingdaalforcemaiins, andanew concrete <br />black buildingfor the electrical equlpmentand controls. The design Included replacement ofpumpingequip- <br />mentwdth nowsubmersible.pumps and a new concrete block building to house the new electrical equipment <br />and controls. <br />Reconstruction of the Los Alamitos hump Station and Retarding Basin, Oounty of Orange, OA <br />Pump station'rechnicatAdvisor, Prepared plans, specifications, and estimates for a new Boo cfsstorm <br />water pump station with natural gas engine.drivea pumps to replace the existing Los Alamitos facility <br />for the County of Orange, Work Included final design for the pump station facility and retarding basin, <br />preparation of a value engineering report, final engineering report, hydrology and hydraulic routing, best <br />management practices for Improving water quality, Inspection and analysis of existing 2,400lineal faot of <br />54 -Inch discharge piping, Phase I and 11 environmental assessments, geotechnical Investigation, CEQA, and <br />permit processing, and coordination withageacles and homeowner associations. The pump station includes <br />fourvert(cal mixed flow pumps with a design capacity of 129 MGD each. Each pump is driven by a lsoo hp <br />dual -fuel engine (natural gas and propane). Engine related components Include a compressed air starting <br />system, primary and secondary Jacket water cooling systexn, natural gas primary fuel system, and propane <br />25E-75 <br />