My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25K - AGMT - PAVEMENT CLEANING SRVS
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
25K - AGMT - PAVEMENT CLEANING SRVS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/19/2018 10:26:29 AM
Creation date
6/14/2018 7:58:06 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Parks, Recreation, & Community Services
Item #
25K
Date
6/19/2018
Destruction Year
2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Personnel <br />6.1 Project Foreman. Unless the Contractor is available as required herein, the Contractor shall <br />provide a Project Foreman to be available during the normal hours of operation to act with full <br />authority for the Contractor. This individual shall be responsible for the supervision, overall <br />administration, and coordination of all required services. The Contractor shall provide the <br />name(s) and telephone number(s) of the Project Foreman(s) within two weeks after contract <br />award date. The Contractor shall provide written notice to the Director in advance of any change <br />of the Project Foreman. The Project Foreman shall be able to understand, speak, read, and write <br />the English language as is necessary for the fulfillment of the terms of the Agreement, The <br />Project Foreman shall return all calls from the Director's Representative within two hours. <br />6.2 Alternate Project Foreman. The Contractor shall designate at least one Alternate Project <br />Foreman to act for the Project Foreman with the same authority during absences of the Project <br />Foreman (e.g., vacation and sick leave). The Contractor shall provide the name(s) and telephone <br />number(s) of the Alternate Project Foreman(s) within two weeks after contract award date. The <br />Contractor shall provide written notice to the Director's Representative in advance of any change <br />of Alternate Project Foreman. The Alternate Project Foreman shall be able to understand, speak, <br />read, and write the English language as is necessary for the fulfillment of the terms of the <br />Agreement. <br />6.3 Other Personnel Requirements <br />6.3.1 All pavement cleaning crews will have a minimum of two (2) employees per crew. One <br />(1st) using the pavement cleaning equipment and the second (2"d) employee to serve as a <br />spotter to alert the operator of any safety concern that may be approaching or encroaching <br />into the operators work space. <br />6.3.2 Legal Residents. The Contractor shall provide only those personnel who are legally <br />entitled to work in the United State to accomplish work and services specified herein. <br />6.3.3 English Comprehension. All Contractor personnel working on the project shall read and <br />understand the English language to the extent necessary to read and understand operation, <br />safety, health, and security regulations relating to the performance of this Agreement, <br />including the following: <br />6.3.3.1 Any necessary instructions concerning equipment to the extent that performing <br />the employee's duties requires the employee to operate, maintain, repair, or in <br />some way interact with the equipment. <br />6.3.3.2 Any regulations, directives, or policies that he must know in order to accomplish <br />the work on the project as a Contractor employee. <br />6.4 Contractor Employee Skills Required, The Contractor's employees performing the services <br />required by this Agreement shall have specialized training, prior work experience, or the <br />demonstrated technical skills to fulfill the specific requirements of these Specifications and the <br />Agreement. <br />6.5 Employee Physical Capabilities. There shall be no discrimination against employees on the basis <br />of handicap or other physically disabling conditions. Contractor shall obey all State and Federal <br />laws concerning the disabled. <br />City of Santa Ana RFP 18-021 <br />Page 14 <br />25K-16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.