My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - M2 PAVEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
55B - RESO - M2 PAVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:25:12 PM
Creation date
6/14/2018 8:19:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br />1. Introduction <br />Cityof Santa Ana <br />Pavement Management Program 2018 <br />Quality Control Plan <br />When performing data collection in any field, the need for quality control is paramount. This <br />need for quality data is essential for accurate planning, analysis and design. NCE's "Quality <br />Assurance Management Plan" (QAMP) affirms that: <br />"NCE is dedicated to achieving technical and management excellence and to <br />delivering professional engineering and environmental services that meet or <br />exceed our clients' needs. NCE's Quality Assurance/Quality Control (QA/QC) <br />Program is designed to achieve these goals. This QA Management Plan <br />(QAMP) describes NCE's QA Program, which is based on four principles: client <br />satisfaction, employee participation, problem prevention, and continuous <br />quality improvements." <br />NCE's QAMP establishes minimum quality standards for performance and procedures for <br />assuring that our clients receive quality service. It requires the participation of employees at <br />every level. It encourages Project Managers and technical staff to take pride in their work <br />and responsibility for ensuring that the work is done correctly the first time. The program is <br />designed to reduce the incidence of problems related to quality and results in <br />implementation, where necessary, of corrective actions and modification of work procedures <br />to minimize the incidence of future problems. <br />NCE has also prepared detailed and specific Quality Control Pians for projects, and the most <br />notable example Is for the Long Term Pavement Performance (LTPP) — Western <br />Regional Support Contract for the Federal Highway Administration. This is a 150 page <br />document that covers data collection on highways, including deflection, profile, pavement <br />distresses, traffic, maintenance and rehabilitation history, materials testing and sampling as <br />well as a document control. <br />1.1. Objectives <br />This document constitutes a formal Quality Control Pian (QCP) for the City of Santa Ana. <br />The focus is on data collection issues as part of the pavement management update. <br />Specifically, it is intended for the 2017/2018 Pavement Management Update. The focus is <br />on the collection of network -level pavement distress data (defined by NCHRP Synthesis 401 <br />Quality Management of Pavement Data Collection, as "Network -level data collection involves <br />collection of large quantities of pavement condition data, which is often converted to <br />individual condition indices or aggregated into composite condition indices.") <br />1.2. Structure <br />The following components are addressed in this QCP: <br />• Condition inspection procedures used <br />• Accuracy required for data collection <br />• Inspector qualifications and experience <br />• Safety <br />1 <br />Engineering & Environmental Services <br />55B-130 <br />
The URL can be used to link to this page
Your browser does not support the video tag.