My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - M2 PAVEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
55B - RESO - M2 PAVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:25:12 PM
Creation date
6/14/2018 8:19:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
David Na <br />2l P a a e <br />Stormwater and Hydrology <br />Hydrology Study & Storm Drain I Project Manager <br />University of California, Irvine <br />Mr. Na worked in conjunction with a consulting firm to conduct a Hydrology Study for Agua Chinon Knolls <br />using the Rational Method and the Unit Hydrograph Method in compliance with the Orange County <br />Hydrology Manual as part of his 'senior design project. <br />Stormwater Drainage System I Project Engineer <br />University of California, Irvine <br />Mr. Na designed a stormwater drainage system for a local site plan using EPA SWMM software. <br />Water/Wastewater - <br />Groundwater Contaminant Remediation Pump Station Design I Project Engineer <br />University of California, Irvine <br />Mr. Na developed a groundwater extraction/injection pumping system to mitigate contaminant/plume <br />migration into underground aquifers for the EI Toro Marine Corps Air Station. <br />Biological Process Design I Project Engineer <br />University of California, Irvine <br />Mr. Na completed a biological process design for full nitrification and denitrification and varied the MCRT <br />during the yearly cycle to meet the monthly permit. <br />Roadway Infrastructure <br />Highway Design I Project Engineer <br />University of California, Irvine <br />Mr. Na designed a partial two-lane highway extension connecting the SR -241 Toll Road and SR -74 Ortega <br />Highway. <br />55B-137 i <br />
The URL can be used to link to this page
Your browser does not support the video tag.