Laserfiche WebLink
M <br />OCTA <br />Pavement Management Plan Agency Submittal <br />Overall, the conclusion drawn from this PMP report is that the backlog for the entire pavement network is <br />evenly distributed across both the arterial and the local network. Additionally, existing funding levels in the <br />City CIP will not keep pace with rehabilitation needs over the next seven years. Since preserving street <br />condition and performance should be a priority to provide motorists with safety assurances, the City's goal <br />over the next seven years is to acquire sufficient pavement M&R funding to sustain the entire street pavement <br />network at "Good" condition or better. By achieving this goal, the City will remain eligible for the reduced <br />local match requirements for the renewed Measure M2 Competitive grant until FY 2024/25. <br />Page I5 <br />55B-148 <br />