My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
55B - RESO - M2 PAVEMENT
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2018
>
06/19/2018
>
55B - RESO - M2 PAVEMENT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/20/2018 12:25:12 PM
Creation date
6/14/2018 8:19:37 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
55B
Date
6/19/2018
Destruction Year
2023
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.0 Pavement Network <br />The improvement in the condition of the local pavement network in recent years resulted largely <br />from the Residential Street Repair Program (RSRP), which is a comprehensive residential street <br />improvement plan that commenced in 2008. A dedicated team of staff and experts evaluated <br />the entire local pavement and incorporated a "Best Streets First" approach for the RSRP, <br />whereby the streets needing the least amount of work are repaired first to prevent further <br />deterioration and the streets categorized in "Very Poor" condition will be repaired last. As of <br />December 2015, 206 centerline miles of local asphalt and concrete residential streets have <br />been repaired through the RSRP. The goal going forward will be utilizing available funding to <br />repair residential concrete streets and establishing preventative maintenance program. Figure <br />3-6 shows the current PCI distribution of the local network. <br />Figure 3-6: Current PCI Distribution (Local Network) <br />PCI 60-74 PCI 41-59 <br />10.7% 6.0% PCI 0-40 <br />PCI 75-85 6.8% <br />17.2% <br />■ PCI 86-100 <br />■ PCI 75-85 <br />■ PCI 60-74 <br />■ PCI 41-59 <br />■ PCI 0-40 <br />PCI 86-100 <br />59.3% <br />City of Santa Ana 2018 Pavement Management Program 3-7 <br />55B-24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.