Laserfiche WebLink
RESOLUTION 2018-)= 3.88% <br />PROPOSED <br />REVENUE FY 17-18 FY 18-19 <br />ACCOUNT DEPARTMENT/MISCELLANEOLIS FEE OR SERVICE UNIT FEES FEES <br />SECTION IX PLANNING & BUILDING AGENCY <br />75A-2-41 31 <br />See individual see individual item <br />51602 <br />49) <br />Addition: up to 1,500 sf Resid 1stfloor- EMP Insp <br />Item schedule schedule <br />51603 <br />51604 <br />See Individual see Individual item <br />53601 <br />50) <br />Addition: up to 1,500 sf Resid 1st floor - EMP Plan Check <br />item schedule schedule <br />53602 <br />53603 <br />53600 <br />51) <br />Addition: up to 500 sf Resid 2nd floor - Structural Plan Check <br />sq. ft. <br />3.56 3.70 <br />51601 <br />52) <br />Addition: up to 500 sf Resid 2nd floor- Structural Insp <br />sq. ft. <br />1.81 1.88 <br />see individual see individual item <br />51602 <br />53) <br />Addition: up to 500 sf Resid 2nd floor - EMP Insp <br />item schedule schedule <br />51603 <br />51604 <br />53600 <br />54) <br />Addition: up to 1,500 sf Resid 2nd floor - Structural Plan Check <br />sq. ft. <br />2.33 2.42 <br />51601 <br />55) <br />Addition: up to 1,500 sf Resid 2nd floor - Structural Insp <br />sq. ft. <br />1.02 1.06 <br />see individual see individual item <br />51602 <br />56) <br />Addition: up to 1,500 sf Resid 2nd floor - EMP Insip <br />Item schedule schedule <br />51603 <br />51604 <br />see individual see individual item <br />53601 <br />57) <br />Addition: up to 1,500 sf Resid 2nd floor - EMP Plan Check <br />Item schedule schedule <br />53602 <br />53603 <br />53600 <br />58) <br />Swilmming Pool, 350 sf - Structural Plan Check <br />sq. ft. <br />0.53 0.55 <br />51601 <br />59) <br />Swimming Pool, 350 sf - Structural Insp <br />sq. ft. <br />0.58 0.61 <br />51602 <br />60) <br />Swimming Pool, 350 sf - EMP Insp <br />see Individual see individual item <br />Item schedule schedule <br />51603 <br />51604 <br />see individual see individual item <br />53601 <br />61) <br />Swimming Pool, 350 sf - EMP Plan Check <br />item schedule schedule <br />S3602 <br />53603 <br />S3600 <br />62) <br />Fence (wood), 20 If - Structural Plan Check <br />if <br />0.37 0.39 <br />51601 <br />63) <br />Fence (wood), 20 If - Structural Insp <br />if <br />0.28 0.29 <br />S3600 <br />64) <br />Retaining Wall, 20 If - Structural Plan Check <br />if <br />0.38 0.40 <br />51601 <br />65) <br />Retaining Wall, 20 If - Structural Insp <br />If <br />0.37 0.39 <br />S3600 <br />6G) <br />TI, 4,000 sf - Structural Plan Check <br />sq. ft. <br />0.34 0.3S <br />51601 <br />67) <br />T1, 4,000 sf - Structural Insp <br />sq. ft. <br />0.24 0.25 <br />75A-2-41 31 <br />