Laserfiche WebLink
RESOLUTION 2018 -XXX <br />3.88% <br />PROPOSED <br />REVENUE <br />FY 17-18 <br />FY 18-19 <br />ACCOUNT <br />DEPARTMENT/MISCELLANEOUS FEE OR SERVICE <br />UNIT <br />FEES <br />FEES <br />SECTION IX <br />PLANNING & BUILDING AGENCY <br />51603 <br />21) Re -inspection fee assessed under applicable provisions <br />PerHour <br />93.17 <br />96.78 <br />of the Building Code <br />51603 <br />22) Inspections for which no fee is specifically <br />Per Hour <br />93.17 <br />96.78 <br />indicated (minimum charge - one (1) hour) <br />53601 <br />23) Additional plan review required by changes, additions, or <br />Per Hour <br />93.17 <br />96.78 <br />revisions to approved plans (minimum charge - one (1) hour) <br />ELECTRICAL PLAN CHECK FEES <br />Whenever electrical plans are required by the Building <br />Official, plan check fees shall be 65% of the electrical <br />permit fee and shall be paid at the time of submitting plans. <br />51604 <br />MECHANICALCODE <br />Any person desiring a permit required by the Mechanical <br />Each Permit <br />44.54 <br />46.27 <br />Code shall, at the time offiling an application, pay a fee <br />of $46.27. There is no minimum fee for the issuance of a <br />permit forsingle family residences and duplexes The <br />minimum total fee for issuance of a permit for all other uses <br />shall be $75.61. <br />72.79 <br />75.61 <br />FEE SCHEDULE <br />51604 <br />1) For the installation or relocation of each forced -air or <br />Each <br />32.50 <br />33.76 <br />gravltV-type furnace or burner, including ducts and <br />vents attached to such appliance, up to and including <br />100,ODO BTU/h <br />51604 <br />2) For the installation or relocation of each forced -air <br />Each <br />46.41 <br />48.21 <br />or gravity -type furnace or burner, including ducts <br />and vents attached to such appliance over 100,000 BTU/h <br />51604 <br />3) For the installation or relocation of each boiler, compressor, <br />Each <br />56.13 <br />58.31 <br />condensing unit or heat pump up to and including five <br />horsepower, or each absorption system to and including <br />100,ODO BTU/h <br />51604 <br />4) For the installation or relocation of each boiler, <br />Each <br />56.13 <br />58.31 <br />compressor, condensing unit or heat pump over five <br />horsepower u p to and including 30 horsepower or <br />for each absorption system over 100,000 BTU/h up <br />to a nd Inclu ding 1,000,000 BTU/h <br />75A-2-68 58 <br />