|
RESUM
<br />Darren Adrian, P.E.
<br />PROJECT MANAGER
<br />Darren has more then 27 years of professional experience In civil engineering
<br />related to planning, deBIgn, and construction of transportation facilities. His primary
<br />emphasis has been in the areas of roadway plannin g and final design associated
<br />With highways and ottoots Including Interchanges, at1radetritersactions, railway grade separations,
<br />widening and rohahnitatloni He has served as project managerfor the City of San1a.Ana On -Call for
<br />several yearsisind brings a superior project management track record combined with technical knowledge
<br />and skill, He recently served as ASCE President for the Orange County Branch, which demonstrates both
<br />hisOodloatlon to the engineering community as wall as the respect he has garnered ornongst,his piers.
<br />Professional Credentials
<br />Bachelor Of.861000, Civil Engineering, California State Polytechnic University, Pomona
<br />Professional EnginsOr In California (06�3031) and Utah (0318105-2202)
<br />American Public Works Association, Member
<br />American Society of Civil Engineers (ASCE), Board Member
<br />Institute of Transportation migIneers, Member
<br />Relevant Experience
<br />• County of Oranqo, On -Call Archfteot(Engineer
<br />Design Support Services (414-17), Orange
<br />County, CA — Project Menager.
<br />• City of Corona On -Call Traffic and Transportation
<br />Services, Corona, CA — Project Engineer
<br />• City of Fontana On -Call Pavement
<br />Rohabliltation/Utility Design, Fontana, CA,
<br />Project Manager
<br />• On -Call Civil Engineering Professional Services,
<br />San Bernardino County, CA -- Project Engineer
<br />.4 On -Call Traffic and Civil 8rigIneering Services,
<br />(Industry), City of Industry, CA — Project Manager
<br />A OCTA, Preliminary Engineering and
<br />Environmental Documentation for 17th Street
<br />Grade Soparatlon Project, Orange County, CA —
<br />Project Manager
<br />A ACE Construction Authority, Phase 11 Grade
<br />Separations PS&E, Fullerton Road Grade
<br />Separation, City of Industry, CA — Project
<br />Manager
<br />A Anaheim Rapid Connection (ARC) Streetcar,
<br />Anaheim, CA — Project Manager
<br />A Azusa Avenue/Amar Road Intersection
<br />Improvements, West Covina, CA — Project
<br />Engineer
<br />A Azus&[Gala intersection Analysis, City of Industry,
<br />CA — Project Manager
<br />• Baseline Road/Lourel Avenue Intersection
<br />Widening, Fontana, CA — Project Manager
<br />• City of Anaheim, Gone Autry Way
<br />Improvements (1-5 to $late College Blvd.)
<br />State College Blvd. Improvements (West Side),
<br />Anaheim, CA — Principal-lh-Charge
<br />• California State University -Long Beach, West
<br />Campus Turnaround Drainage (Veteran Affairs),
<br />Long Beach, CA — Project Manager
<br />4 City of Buena Park, SR 01/BaAch Blvd WB Exit
<br />Ramp, Buena Park, CA — Project Manager
<br />A CSU Long Beach, East Campus Road - Safety
<br />Improvements, Long Bomoh. CA — QC/QA
<br />Reviewer
<br />A Diamond Bar Prospectors Road Street
<br />Rehabilitation Project, Diamond Bar, CA —
<br />Projeot.Manager
<br />,d East Coast Highway Slonal Rehab Design,
<br />Newport Beach, CA Project Dlrecto�
<br />• Firestone Boulevard Improvements, Buena
<br />Fork, CA— Project Manager
<br />• Pavement Rehabilitation (Task Order Under On -
<br />Call), Pomona, CA — Project Manager
<br />• Traffic Flow Improvement Study of Artesia
<br />Boulevard from 1-5 to Beach Boulevard, Buena
<br />Park, CA — Project Manager
<br />25E-40
<br />,at I
<br />Kimlepftrn
<br />
|