Laserfiche WebLink
RESUM <br />Darren Adrian, P.E. <br />PROJECT MANAGER <br />Darren has more then 27 years of professional experience In civil engineering <br />related to planning, deBIgn, and construction of transportation facilities. His primary <br />emphasis has been in the areas of roadway plannin g and final design associated <br />With highways and ottoots Including Interchanges, at1radetritersactions, railway grade separations, <br />widening and rohahnitatloni He has served as project managerfor the City of San1a.Ana On -Call for <br />several yearsisind brings a superior project management track record combined with technical knowledge <br />and skill, He recently served as ASCE President for the Orange County Branch, which demonstrates both <br />hisOodloatlon to the engineering community as wall as the respect he has garnered ornongst,his piers. <br />Professional Credentials <br />Bachelor Of.861000, Civil Engineering, California State Polytechnic University, Pomona <br />Professional EnginsOr In California (06�3031) and Utah (0318105-2202) <br />American Public Works Association, Member <br />American Society of Civil Engineers (ASCE), Board Member <br />Institute of Transportation migIneers, Member <br />Relevant Experience <br />• County of Oranqo, On -Call Archfteot(Engineer <br />Design Support Services (414-17), Orange <br />County, CA — Project Menager. <br />• City of Corona On -Call Traffic and Transportation <br />Services, Corona, CA — Project Engineer <br />• City of Fontana On -Call Pavement <br />Rohabliltation/Utility Design, Fontana, CA, <br />Project Manager <br />• On -Call Civil Engineering Professional Services, <br />San Bernardino County, CA -- Project Engineer <br />.4 On -Call Traffic and Civil 8rigIneering Services, <br />(Industry), City of Industry, CA — Project Manager <br />A OCTA, Preliminary Engineering and <br />Environmental Documentation for 17th Street <br />Grade Soparatlon Project, Orange County, CA — <br />Project Manager <br />A ACE Construction Authority, Phase 11 Grade <br />Separations PS&E, Fullerton Road Grade <br />Separation, City of Industry, CA — Project <br />Manager <br />A Anaheim Rapid Connection (ARC) Streetcar, <br />Anaheim, CA — Project Manager <br />A Azusa Avenue/Amar Road Intersection <br />Improvements, West Covina, CA — Project <br />Engineer <br />A Azus&[Gala intersection Analysis, City of Industry, <br />CA — Project Manager <br />• Baseline Road/Lourel Avenue Intersection <br />Widening, Fontana, CA — Project Manager <br />• City of Anaheim, Gone Autry Way <br />Improvements (1-5 to $late College Blvd.) <br />State College Blvd. Improvements (West Side), <br />Anaheim, CA — Principal-lh-Charge <br />• California State University -Long Beach, West <br />Campus Turnaround Drainage (Veteran Affairs), <br />Long Beach, CA — Project Manager <br />4 City of Buena Park, SR 01/BaAch Blvd WB Exit <br />Ramp, Buena Park, CA — Project Manager <br />A CSU Long Beach, East Campus Road - Safety <br />Improvements, Long Bomoh. CA — QC/QA <br />Reviewer <br />A Diamond Bar Prospectors Road Street <br />Rehabilitation Project, Diamond Bar, CA — <br />Projeot.Manager <br />,d East Coast Highway Slonal Rehab Design, <br />Newport Beach, CA ­ Project Dlrecto� <br />• Firestone Boulevard Improvements, Buena <br />Fork, CA— Project Manager <br />• Pavement Rehabilitation (Task Order Under On - <br />Call), Pomona, CA — Project Manager <br />• Traffic Flow Improvement Study of Artesia <br />Boulevard from 1-5 to Beach Boulevard, Buena <br />Park, CA — Project Manager <br />25E-40 <br />,at I <br />Kimlepftrn <br />